Laserfiche WebLink
r <br />❑NR <br />October 29, 2021 <br />Division of Water Resources <br />Department of Natural Resources <br />Mr. Rick Parsons, P.E. <br />Parsons Water Consulting, LLC <br />1619 Minear Road <br />Medford, Or 97501 <br />Re: Frei Hatchery Pit Substitute Water Supply Plan (WDID 0202887) Amendment <br />DRMS File No. M-2014-043(WDID 0210500) <br />Section 20, T2S, R67W of the 6th P.M. <br />Water Division 1, Water District 2, Adams County <br />SWSP ID: 5932 <br />Approval Period: April 1, 2021 through November 30, 2023 <br />Contact Phone Number for Mr. Rick Parsons: 303-667-5067 <br />Contact Email Address for Mr. Rick Parsons: rick. parsons@parsonswater.com <br />Dear Mr. Parsons: <br />This letter is in response to your letter dated June 3, 2021, requesting a substitute water supply <br />plan ("SWSP") amendment to the current SWSP approved on November 18, 2019 for the Frei <br />Hatchery Pit site operated by Albert Frei and Sons ("AFS" or "Applicant") in accordance with § <br />37-90-137(11), C.R.S. The current SWSP approval covers depletions for the period of August 1, <br />2019 through February 28, 2022. Phase 2 of the mining operations at the site is behind schedule <br />therefore the actual mining operations will extend through April 2023 and lagged depletions will <br />extend through November 2023. Approval of this SWSP amendment supersedes the SWSP <br />amendments approved on November 18, 2019 and August 12, 2020 for the period of this plan <br />approval. The required fee of $257 for this SWSP has been submitted (receipt nos. 10012690). <br />SWSP Operations <br />The Frei Hatchery Pit is permitted for 53.2 acres and is located in the SW1 /4, Section 20, <br />Township 2 South, Range 67 West of the 6th P.M. The property includes a 6.5-acre pond and a 0.3 <br />acre pond that were exposed prior to 1981. The sand and gravel at the site is being excavated in <br />two phases. The mining of Phase 1 was completed. Phase 2 will continue to be mined through April <br />2023. The aquifer profile in the Phase 2 area includes about 15 feet of saturated thickness above <br />bedrock that is overlain with dry material to the ground surface. AFS dewatered approximately 20 <br />acres within Phase 2 in order to install a compacted liner to facilitate dry mining in that area. <br />The depletions that result from the mining operation during this plan period include dust <br />suppression and water lost with the mined product. The proposed reclamation of the site is a <br />combination of pre-1981 exposed surface area and backfill of the mining cells. The Applicant <br />proposes to replace out -of -priority lagged depletions from the mining operation using fully <br />consumable water leased from the City of Aurora. <br />Pursuant to § 37-90-137(11)(b), C.R.S. and 2009CW49, a gravel pit operator or property owner <br />does not need to replace depletions that occur due to evaporation from ground water exposed <br />113 Sherman Street, Room $21, Denver. CO MO P 303.M6-158-, www xplorado.Y,ater I �w. <br />pF Cpj0 <br />Jared S. Polis, Governor I Dan Gibbs, Executive Director I Kevin G. Rein. State EngineerfDirector 1 �' <br />