My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-27_PERMIT FILE - M2021059
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2021-10-27_PERMIT FILE - M2021059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 4:58:20 AM
Creation date
10/28/2021 9:15:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
PERMIT FILE
Doc Date
10/27/2021
Doc Name Note
Incomplete Submittal Response and Errata
Doc Name
Incompleteness Response
From
Telesto Solutions Incorporated
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 EXHIBIT D — MINING PLAN <br /> This exhibit provides the information required by Section 6.4.4 of the Rules and <br /> Regulations. <br /> 6.1 Mining Methods and Surface Disturbance <br /> Section 6.1 provides the information required in Sub-section 6.4.4(a) Rules and <br /> Regulations. <br /> The entire site consists of 114.25 acres. There are approximately 76 acres that LRM will <br /> utilize for mining. Approximately 38 acres of the site will consist of boundary offsets, <br /> perimeter buffering the main access road, the Big Thompson River corridor, and <br /> stormwater management areas. <br /> 6.1.1 Site Preparation <br /> The site will first be cleared of unneeded existing structures(old fencing and cattle chutes). <br /> The topsoil, if present,material will be stripped as each Cell is mined. Stripping will occur <br /> in phases or"strips" approximately 1/8th to 1/41h of the size of the Cell to expose the active <br /> mining area. The stripped material will be stockpiled adjacent to the active mining area. <br /> Scrapers, front-end loaders, excavators, and bulldozers may be used for stripping. Topsoil <br /> stockpiles, ditches and grading may be used to direct stormwater into the mining cells. <br /> Exhibit C shows the quantities of topsoil for each phase. A typical topsoil stockpile berm <br /> size will be 36 feet in width, 10 foot high, or 6.6 sq-yd per ft. The topsoil stockpiles will <br /> be stabilized, and erosion control devices will be installed. If the topsoil stockpiles will be <br /> in place for an extended amount of time it will be seeded to produce a vegetated cover. <br /> An access bridge across the Big Thompson River will require a 404 Permit to construct. <br /> As part of the 404 Permit the bridge will be installed and analyzed to certify that it does <br /> not create a rise in the floodway. Haul roads will be established and stabilized during site <br /> preparation. <br /> Loveland Ready-Mix,Concrete,Inc. 6 September 2021 <br /> 20210912_maucr_apphcalwn_lrm_du prt_6nal draft dcez T E L E S T <br />
The URL can be used to link to this page
Your browser does not support the video tag.