Laserfiche WebLink
Table 1 <br /> Bernhardt Pit <br /> Evaporative and Operational Losses <br /> Percent of Gross Average Effective Net Net Water Surface <br /> Month Annual Evaporation Precipitation Precipitation Evaporation Evaporation for <br /> Evaporation 4.3 <br /> (inches) (inches) (inches) (inches) (acre-feet) <br /> I1] [2] [3] [4] 151 [6] <br /> January 3.0% 1.32 0.40 0.28 1.03 0.37 <br /> February 3.5% 1.53 0.39 0.28 1.26 0.45 <br /> March 5.5% 2.41 1.10 0.77 1.65 0.59 <br /> April 9.0% 3.95 1.60 1.12 2.82 1.01 <br /> May 12.0% 5.26 2.51 1.76 3.50 1.26 <br /> June 14.5% 6.36 1.68 1.18 5.18 1.86 <br /> July 15.0% 6.58 1.11 0.77 5.80 2.08 <br /> August 13.5% 5.92 1.24 0.87 5.05 1.81 <br /> September 10.0% 4.39 1.24 0.87 3.51 1.26 <br /> October 7.0% 3.07 0.85 0.59 2.48 0.89 <br /> November 4.0% 1.75 0.68 0.47 1.28 0.46 <br /> December 3.0% 1.32 0.47 0.33 0.99 0.35 <br /> Total 1 100.0% 43.86 13.27 9.29 34.57 12.39 <br /> Percent of Amount of Water Lost Percent of Amount of Water Used Water Used Total <br /> Month Annual Aggregate With Mined Annual Concrete in Concrete for Dust Evaporative <br /> Aggregate Production Aggregate &Concrete Production Batching Control &Operational <br /> Production Production Losses <br /> (tons) (acre-feet) (cubic yards) (acre-feet) (acre-feet) (acre-feet) <br /> [7] [8] 191 [10] [11] [12] [13] [14] <br /> January 6.3% 25,267 0.00 0.0% 0 0.00 0.18 0.55 <br /> February 5.3% 21,204 0.00 0.0% 0 0.00 0.18 0.63 <br /> March 9.0% 36,102 0.00 0.0% 0 0.00 0.18 0.77 <br /> April 8.7% 34,742 0.00 0.0% 0 0.00 0.18 1.19 <br /> May 7.2% 28,696 0.00 0.0% 0 0.00 0.18 1.44 <br /> June 11.7% 46,854 0.00 0.0% 0 0.00 0.18 2.04 <br /> July 10.2% 40,684 0.00 0.0% 0 0.00 0.18 2.26 <br /> August 10.0% 39,821 0.00 0.0% 0 0.00 0.18 1.99 <br /> September 9.8% 39,025 0.00 0.0% 0 0.00 0.18 1.44 <br /> October 9.0% 35,839 0.00 0.0% 0 0.00 0.18 1.07 <br /> November 7.0% 27,875 0.00 0.0% 0 0.00 0.18 0.64 <br /> December 6.0% 24,000 0.00 0.0% 0 0.00 0.18 0.53 <br /> Total 1 100.0% 400,000 0.00 0.0% 0 0.00 2.16 14.55 <br /> Notes: <br /> [1]From SB 120,the evaporation percentages are for gravel pits with elevations below 6,500 feet. <br /> [2]Equals Percent of Annual Evaporation times 43.86 inches. <br /> [3]From Colorado State Universitys Colorado Climate Center web page,hftpJ/ccc.atmos.colostate.edu for Longmont Weather Station. <br /> [4]Equals Column(3)times 70 percent.70 percent value was taken from SB 120. <br /> [5]Equals Column(2)minus Column(4).If the resultant value is less than zero then a zero is substituted. <br /> [6]Equals Column(5)divided by 12 times 6.18 acres.Includes Pond 1(5.18 ac),and 1 acre of sump and dewatering in Pond 4. <br /> [7]Based on information from Hall-Irwin. <br /> [8]Equals Column(7)times 400,000 tons per year.Production based on information from Besfway. <br /> [9]Equals Column(2)times 2000 times 4%divided by 62.4 divided by 43,560.The provisional leak test for Pond 4was <br /> apporved and the other miming areas are also approved slurry lined cells,therefore no water is lost in production of the <br /> aggregate. <br /> [10]Based on information from Bestway. <br /> [11]Equals Column(10)times zero cy per year. <br /> [12]Equals Column(11)times 40 gallons druided by 325851.Assume a use of 40 gallons per cubic yard of concrete production. <br /> [13]Equals 3,953 gallons per day times number of operating days(30.5 days)in the month divided by 325,851,during production months. <br /> [14]Equals Column(6)plus Column(9)plus Column(12)plus Column(13). <br /> BERN SWSP2022.xls Civil Resources,LLC,9/7/2021 <br />