Laserfiche WebLink
Bernhardt Pit SWSP Page 5 of 5 <br /> October 27, 2021 <br /> must be filed with the Division 1 Water Court at least three (3) years prior to the <br /> completion of mining to include, but not be limited to, long-term evaporation losses and <br /> lagged depletions. If a lined pond results after reclamation, replacement of lagged <br /> depletions shall continue until there is no longer an effect on stream flow. <br /> 14. In accordance with amendments to section 25-8-202(7), C.R.S., and Senate Bill 89-181 <br /> Rules and Regulations adopted on February 4, 1992, the state engineer shall determine <br /> whether the substitute supply is of a quality to meet requirements of use to senior <br /> appropriators. As such, water quality data or analysis may be requested at any time to <br /> determine if the water quality is appropriate for downstream water users. <br /> 15. The State Engineer may revoke this SWSP or add additional restrictions to its operation <br /> if at any time the State Engineer determines that injury to other vested water rights has <br /> occurred or will occur as a result of the operation of this SWSR Should this substitute <br /> water supply plan expire without renewal or be revoked prior to adjudication of a <br /> permanent plan for augmentation, all excavation of product from below the water table, <br /> and all other use of water at the pit, must cease immediately. <br /> 16. The decision of the state engineer shall have no precedential or evidentiary force, shall <br /> not create any presumptions, shift the burden of proof, or serve as a defense in any water <br /> court case or any other legal action that may be initiated concerning the substitute water <br /> supply plan. This decision shall not bind the State Engineer to act in a similar manner in <br /> any other applications involving other plans or in any proposed renewal of this plan, and <br /> shall not imply concurrence with any findings of fact or conclusions of law contained <br /> herein, or with the engineering methodologies used by the Applicant. <br /> If you have any questions concerning this approval, please contact Wenli Dickinson in Denver at <br /> (303) 866-3581 or Michael Hein in Greeley at (970) 352-8712. <br /> Sincerely, <br /> Jeff Deatherage, P.E. <br /> Chief of Water Supply <br /> Attachments: Figure 1 and Tables 1-4 <br /> Groundwater Management Subdistrict Lease <br /> April 2010 DRMS Letter <br /> cc: Michael Hein, Assistant Division Engineer, Michael.Hein@state.co.us <br /> Jean Lever, Water Commissioner, District 4, Jean.Lever@ state.co.us <br /> Brent Schantz, River Operations St Compact Coordinator, Brent.Schantz@state.co.us <br /> Louis Flinck, Water Rights/Diversion Records Coordinator, Louis.Flinko-state.co.us <br /> Division of Reclamation Mining and Safety, Peter.Hayeso state.co.us <br /> JD/wad: Bernhardt Approval 2022.docx <br />