Laserfiche WebLink
of <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> * " 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-356 --C Is ED <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEETOCT 2 6 2021 <br /> ` Colorado Division of Redamalon, <br /> File No.: M- �2 000 ` c�`�� Site Name: �Y.-SFr--� �,�c�u e � <br /> -Mi�ganu saieiy <br /> County TR# 3 DRMS Use onlyl <br /> Operator(If Other than Permittee): k M-2000-088 TR-3 <br /> Complied 0 Violations <br /> Permittee Representative: 7 Minor Infractions ERR/JDM <br /> Please provide a brief description of the proposed revision: <br /> 66V0w "In c7r (.G�vI�R <br /> � �'-(=-�C�Yrl C•'sly c�r1 <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. I€at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> I I Oc, 111, 112 construction <br /> materials, and 112 quarries $216 r7/ <br /> It 2 hard rock(not DMO) $175 <br /> 1 IOd, 112d(l, 2 or 3) $1006 <br />