Laserfiche WebLink
TR1 Adequacy Review 1 <br /> Bemhardt Resource(Permit M2002-120) <br /> Page 2 of 2 <br /> 3) What BMP's will be utilized during construction of the crossing to minimize <br /> sediment loading to the river? <br /> 4) Please provide a detailed breakdown of costs for removal of the crossing when it is no <br /> longer needed so that the reclamation bond for the site may be appropriately <br /> modified. <br /> This concludes the Division's adequacy review of TR1. This letter shall not be construed to <br /> mean that there are no other technical issues in the submittal. Other issues may arise as <br /> additional information is supplied. <br /> If you have any questions, please contact me at eric.scott(&,state.co.us or at(303)229-9414. <br /> Sincerely, <br /> Eric Scott <br /> Environmental Protection Specialist <br />