My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-22_PERMIT FILE - M2021050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021050
>
2021-10-22_PERMIT FILE - M2021050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:15:36 PM
Creation date
10/24/2021 5:18:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021050
IBM Index Class Name
PERMIT FILE
Doc Date
10/22/2021
Doc Name
Adequacy Review Response
From
J & P Trucking
To
DRMS
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J & P TRUCKING CALICH E PIT <br /> Exhibit E <br /> Reclamation Plan <br /> Proposed permitted area is currently being used as range land, <br /> adjoining land to the north is farmland, with all other adjoining <br /> land being range land. Approximately 3 acres in the north part <br /> of proposed phase 1 is currently range land, however, <br /> landowner has requested it be reclaimed to farm ground to <br /> complete an existing irrigated circle. The recommended seed <br /> mixture for the areas to be returned to range land is Sand <br /> Dropseed (20%) 0.10 pis/acre, Blue Grama (25%) 0.63 <br /> pis/acre, Side oats Grama (25%) 2.28 pis/acre, Western <br /> Wheatgrass (20%) 3.20 pis/acre, and Buffalo grass (10%) <br /> 1.65 pis/acre for a total 7.85 Pounds PLS per acre. No trees <br /> or shrubs will be planted. All slopes will be done at 3:1 or <br /> longer. There will be no back filling required. In preparation <br /> for the seed bed, affected areas will be ripped with loader <br /> teeth, topsoil will then be spread and leveled to an even depth <br /> with a loader, anticipated depth being approx. 1 - 4 inches. <br /> Then ripped again (topsoil) prior to seeding with the <br /> recommended seed mixture. Seeding will be done by hand <br /> broadcast due to the acreage. The seeding rate will be 7.85 <br /> Pounds PLS per Acre, as set by NRCS guidelines for hand <br /> broadcasting. Seeding will be done between November 1" and <br /> May 15th. No fertilization is anticipated to be needed. Topsoil <br /> stockpiles, as mentioned in the mining plan, will be seeded <br /> with Western Wheatgrass to prevent erosion if left in place <br /> longer than one growing season. Noxious weeds will be <br /> monitored and controlled as per the attached noxious weed <br /> control and monitoring plan for this site. Reclamation will be <br /> initiated inside each phase's boundaries once all desired <br /> product has been removed from said phase, beginning with <br /> Phase 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.