Laserfiche WebLink
SEDCAD 4 for Windows <br /> !`nn.,rin h4 10°A 9n1n D-1� I Q,k--h <br /> 20 <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 7,283.00 0.001 0.000 0.000 Top of Sed. Storage <br /> 7,283.01 0.001 0.000 0.000 <br /> 7,284.00 0.059 0.023 0.000 <br /> 7,285.00 0.159 0.128 0.000 <br /> 7,286.00 0.182 0.298 0.000 <br /> 7,287.00 0.213 0.495 0.000 Spillway#1 <br /> 7,287.04 0.216 0.505 3.062 9.40 Peak Stage <br /> 7,288.00 0.247 0.725 71.329 <br /> Detailed Discharge Table <br /> Combined <br /> Elevation Emergency Total <br /> (ft) Spillway(cfs) Discharge <br /> (cfs) <br /> 7,283.00 0.000 0.000 <br /> 7,283.01 0.000 0.000 <br /> 7,284.00 0.000 0.000 <br /> 7,285.00 0.000 0.000 <br /> 7,286.00 0.000 0.000 <br /> 7,287.00 0.000 0.000 <br /> 7,288.00 71.329 71.329 <br /> Structure #8 6R1 rap Channe/� <br /> Taylor Ditch 35+00 to TD-1 Stockpond <br /> Trapezoidal Riprap Channel Inputs: <br /> Material: Riprap <br /> Left Right Freeboard Freeboard Freeboard <br /> Bottom a Sideslo a Slope Width(ft) Sideslo p p ( ) Depth (ft) %of Depth Mult.x <br /> Ratio Ratio <br /> (VxD) <br /> 12.00 3.0:1 3.0:1 10.7 <br /> Riprap Channel Results: <br /> Simons/OSM Method - Steep Slope Design <br /> w/o Freeboard w/ Freeboard <br /> Design Discharge: 3.13 cfs <br /> Depth: 0.05 ft <br /> Top Width: 12.30 ft <br /> Velocity*: <br /> Filename: East Taylor Pond 10 Yr 24 Hr Post Mine.sc4 Printed 07-19-2021 <br />