Laserfiche WebLink
SEDCAD 4 for Windows <br /> r�.,.,...h 1aaa 001n o�. 1, i c..h....k <br /> 11 <br /> Structure Detail; <br /> Structure #17(Ponds <br /> Simulated 250 GPM - East Taylor Seep <br /> Pond Inputs: <br /> Initial Pool Elev: 90.01 ft <br /> Initial Pool: 0.00 ac-ft <br /> *Sediment Storage: 0.00 ac-ft <br /> Dead Space: 0.00% <br /> *No sediment capacity defined <br /> Pond Results: <br /> Peak Elevation: 92.05 ft <br /> H'graph Detention Time: 2.21 hrs <br /> Pond Model: CSTRS <br /> Dewater Time: 0.40 days <br /> Trap Efficiency: 76.86% <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 90.00 0.050 0.000 0.000 Top of Sed. Storage <br /> 90.01 0.050 0.001 0.000 <br /> 91.00 0.051 0.050 0.560 <br /> 92.00 0.190 0.164 0.560 <br /> 92.05 0.161 0.174 0.560 9.70 Peak Stage <br /> 93.00 0.260 0.388 0.560 <br /> 94.00 0.350 0.692 0.560 <br /> 95.00 0.440 1.086 0.560 <br /> 96.00 0.540 1.575 0.560 <br /> 97.00 0.650 2.169 0.560 <br /> 98.00 0.760 2.873 0.560 <br /> 99.00 0.880 3.693 0.560 <br /> 100.00 1.200 4.728 0.560 <br /> 101.00 1.240 5.948 0.560 <br /> 102.00 1.414 7.275 0.560 <br /> 103.00 1.600 8.781 0.560 <br /> Filename: East Taylor Pond 10 Yr 24 Hr Post Mine.sc4 Printed 07-19-2021 <br />