Laserfiche WebLink
LIST OF EXHIBITS <br /> Volume 18C <br /> Exhibit 7, Item 23 Sediment Control Plan Parts J—M <br /> Exhibit 7, Item 25 Collom Post Mine Channel Design <br /> Exhibit 7, Item 25A Collom In Pit Drilling Small Area Exemption <br /> Exhibit 7, Item 25B Collom Topsoil Depth Testing Small Area Exemption <br /> Exhibit 7, Item 25C Temporary Access Road Small Area Exemption <br /> Exhibit 7, Item 25D Power Line Light-Use Road Small Area Exemption <br /> Volume 18D <br /> Exhibit 7,Item 26 Collom Pond As-Builts <br /> Volume 19 <br /> Exhibit 9, Item 8 Baseline Survey of Soil Resources Collom Mining Area, Tetra Tech,July 2006 <br /> Exhibit 9, Item 9 Prime Farmland Determination Documentation <br /> Volume 20 <br /> Exhibit 10, Item 6 Proposed Collom Coal Mine Project Baseline Vegetation Survey, May 2006, <br /> Cedar Creek Associates,Inc. <br /> Exhibit 10, Item 7 Wetlands and Waters of the US Delineation for Collom Project, May 2006, <br /> Cedar Creek Associates,Inc. <br /> Exhibit 11, Item 1 Wildlife Survey Report for the Collom Permit Study Area,August 25,2006, <br /> Cedar Creek Associates,Inc. <br /> Exhibit 11, Item 2 2007 Wildlife Monitoring Report for the Collom Permit Study Area, <br /> December 20,2007, Cedar Creek Associates,Inc. <br /> Exhibit 13C Cumulative Bond ScheduleExhibit 14,Item 7 Pre-Blast Survey — Structures <br /> within'/2 Mile of Collom Mining Area <br /> (Pending) <br /> Exhibit 14, Item 8 Pre-Blast Survey—Offering Letters (Pending) <br /> Pre-Blast Structure Locations Drawing(Pending) <br /> Exhibit 23, Item 1 Geotechnical Report—Collom Temporary Spoil Pile and Pond <br /> Exhibit 23, Item 2 Addendum to Geotehcnial Study for the Collom Temporary Spoil Pile <br /> ix Revision Date: 5/18/21 <br /> Revision No.: TR-147 <br />