My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-19_HYDROLOGY - M2001085
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2021-10-19_HYDROLOGY - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:12:16 PM
Creation date
10/20/2021 5:37:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
10/19/2021
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GSL Sand Et Gravel Substitute Water Supply Plan Page 4 of 5 <br /> October 19, 2021 <br /> credit only for actual amounts released as shown in the entity's accounting. For the period of <br /> this plan, that entity is the City of Aurora (WDID 0802593 - Aurora Reuse). <br /> 9. The name, address, and phone number of a contact person who will be responsible for the <br /> operation and accounting of this plan must be provided on the accounting forms to the Division <br /> Engineer and Water Commissioner. <br /> 10. Conveyance loss for delivery of augmentation water to the South Platte River is subject to <br /> assessment and modification as determined by the Division Engineer. <br /> 11. The Division Engineer, or his designated representative, will administer all such water <br /> transported in the South Platte River or its tributaries under this SWSP, including water for <br /> replacement of depletions, past intervening headgate to ensure that such water is not <br /> intercepted or otherwise diminished in quantity by diversion, use or other interference by <br /> intervening water rights and to assure that such water remains available and suitable for <br /> Applicant's uses under this SWSP, except when any intervening headgate is diverting the entire <br /> flow of ("sweeping") the river. In the event that delivery past headgate which sweep the river <br /> requires the installation of a bypass structure or the use of an existing bypass structure by <br /> agreement with a third-party, Applicant is responsible for either installation a new bypass <br /> structure with a continuous recording measuring device(s) as approved by the Water <br /> Commissioner or securing an agreement with a third-party to use an existing bypass structure <br /> and providing such information and agreement to the Division Engineer. <br /> 12. The approval of this substitute water supply plan does not relieve the Applicant and/or the <br /> landowner of the requirement to obtain a Water Court decree approving a permanent plan for <br /> augmentation or mitigation to ensure the permanent replacement of all depletions, including <br /> long-term evaporation losses and lagged depletions after gravel mining operations have ceased <br /> if reclamation of the mine site will produce a permanent water surface exposing groundwater <br /> to evaporation, or lagged depletions only if a lined pond results after reclamation, until there <br /> is no longer an effect on stream flow. <br /> 13. DRMS Permit No. M-2001-085 no longer requires a lined reservoir in the final reclamation plan. <br /> The Applicant's proposed amendment to DRMS, changing the final reclamation plan from water <br /> storage to an inert backfill operation, was approved. With the next SWSP renewal request, the <br /> Applicant is required to continue to demonstrate they are in compliance with their DRMS permit <br /> reclamation plan and the April 30, 2010 DRMS letter (attached). <br /> 14. The Applicant is required to maintain their DRMS permit and an adequate bond to cover their <br /> reclamation plan until (1) there are no longer lagged depletions hitting the river, (2) a suitable <br /> augmentation plan is obtained, or (3) another party assumes full augmentation responsibilities. <br /> The Applicant has a current bond of $368,590 to account for backfilling the pit. With all future <br /> SWSP renewal requests, the Applicant will be required to demonstrate continuing compliance, <br /> or diligent pursuit of compliance, with the April 30, 2010 DRMS letter, specifically in regard to <br /> the required financial warranty for the site. <br /> 15. The State Engineer may revoke this SWSP or add additional restrictions to its operation if at any <br /> time the State Engineer determines that injury to other vested water rights has occurred or will <br /> occur as a result of the operation of this SWSP. Should this SWSP expire without renewal or be <br /> revoked prior to adjudication of a permanent plan for augmentation, all excavation of the <br /> product from below the water table, and all other use of water at the pit, must cease <br /> immediately. In addition, lack of timely accounting may prevent proper administration, which <br /> may lead to revocation or modification of this plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.