Laserfiche WebLink
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2 —VIMA Partners, LLC <br /> 3:1 slope. Once the reservoir is filled with raw water, topsoil along with planting and <br /> seeding will take place. The seeding and mulching operation will follow the <br /> recommendations as set forth in the Mile High Flood District Criteria Manual. Clean, weed- <br /> free and seed-free cereal grain straw will be applied evenly at a rate of 2 tons per acre and <br /> will be tacked or fastened by a method suitable for the condition of the site. Straw mulch <br /> will be anchored on the surface mechanically by crimping. Depending on the time of <br /> completion, seeding and mulching will most likely take place in the fall of 2022 or early <br /> spring of 2023. There will be no trees or shrubs used around the reservoir. <br /> %i1ji-CONSULTING ENGINEERS <br />