Laserfiche WebLink
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2 —VIMA Partners, LLC <br /> of creating a reservoir. Excavated sandy clay borrow material is being used for the 1-25 <br /> expansion project by CDOT. Additionally, some of the sandy clay borrow material will be <br /> used for development in the surrounding area.After the reservoir is excavated and graded, <br /> topsoil will be imported to cover the exposed land not covered by the extents of the <br /> reservoir water. This will allow for reclamation to occur throughout the site. <br /> %iir. <br /> i <br /> C.CONSULTING ENGINEERS <br />