My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-19_PERMIT FILE - M2021049
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021049
>
2021-10-19_PERMIT FILE - M2021049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 2:22:07 AM
Creation date
10/20/2021 5:19:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021049
IBM Index Class Name
PERMIT FILE
Doc Date
10/19/2021
Doc Name
Adequacy Review Response
From
VIMA Partners, LLC
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2 —VIMA Partners, LLC <br /> of creating a reservoir. Excavated sandy clay borrow material is being used for the 1-25 <br /> expansion project by CDOT. Additionally, some of the sandy clay borrow material will be <br /> used for development in the surrounding area.After the reservoir is excavated and graded, <br /> topsoil will be imported to cover the exposed land not covered by the extents of the <br /> reservoir water. This will allow for reclamation to occur throughout the site. <br /> %iir. <br /> i <br /> C.CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.