Laserfiche WebLink
TABLE 4(continued) <br /> GSL SAND AND GRAVEL MINE <br /> REPLACEMENT SCHEDULE ASSUMING POND ALLOWED TO FILL BY JANUARY 16,2012(NO LINER),MINING CEASED ON NOVEMBER 22,2011 <br /> (DEPLETIONS AND DELIVERIES ARE CONSIDERED POSITIVE IN THIS TABLE) <br /> (1) (2) (3) (4 <br /> LAGGED TOTAL GROUND NET EFFECT TO RIVER <br /> WATER EVAPORATION LAGGED (INCLUDES DEPLETIONS FROM <br /> YEAR AND CREDIT CREDIT FOR WATER DEWATERING AND LAGGED <br /> MONTH OPERATIONAL FOR WATER PLACED IN PLACED IN SOUTH PLAT TE ACRETIONS FROM CREDITS TO S.P <br /> WATER LOSSES HENDERSON WATER SKI LAKE RIVER(INSTANTANEOUS) AND WATER SKI LAKE) <br /> (ACRE-FEET) (ACRE-FEET) (ACRE-FEET) (ACRE-FEET) <br /> Nov 2019 through October 2020 <br /> NOV 0.90 0.00 0.00 0.90 <br /> DEC 0.77 0.00 0.00 0.77 <br /> JAN 0.67 0.00 0.00 0.67 <br /> FEB 0.59 0.00 0.00 0.59 <br /> MAR 0.54 0.00 0.00 0.54 <br /> APR 0.53 0.00 0.00 0.53 <br /> MAY 0.59 0.00 0.00 0.59 <br /> JUN 0.68 0.00 0.00 0.68 <br /> J U L 0.82 0.00 0.00 0.82 <br /> AUG 0.92 0.00 0.00 0.92 <br /> SEP 0.97 0.00 0.00 0.97 <br /> OCT 0.92 0.00 0.00 0.92 <br /> TOTAL 8.90 0.00 0.00 8.90 <br /> Nov 2020 through October 2021 <br /> NOV 0.77 0.00 0.00 0.77 <br /> DEC 0.63 0.00 0.00 0.63 <br /> JAN 0.52 0.00 0.00 0.52 <br /> FEB 0.43 0.00 0.00 0.43 <br /> MAR 0.37 0.00 0.00 0.37 <br /> APR 0.33 0.00 0.00 0.33 <br /> MAY 0.31 0.00 0.00 0.31 <br /> JUN 0.31 0.00 0.00 0.31 <br /> J U L 0.33 0.00 0.00 0.33 <br /> AUG 0.35 0.00 0.00 0.35 <br /> SEP 0.35 0.00 0.00 0.35 <br /> OCT 0.33 0.00 0.00 0.33 <br /> TOTAL 5.03 0.00 0.00 5.03 <br /> Nov 2021 through October 2022 <br /> NOV 0.29 0.00 0.00 0.29 <br /> DEC 0.25 0.00 0.00 0.25 <br /> JAN 0.22 0.00 0.00 0.22 <br /> FEB 0.19 0.00 0.00 0.19 <br /> MAR 0.17 0.00 0.00 0.17 <br /> APR 0.17 0.00 0.00 0.17 <br /> MAY 0.18 0.00 0.00 0.18 <br /> JUN 0.21 0.00 0.00 0.21 <br /> J U L 0.25 0.00 0.00 0.25 <br /> AUG 0.28 0.00 0.00 0.28 <br /> SEP 0.29 0.00 0.00 0.29 <br /> OCT 0.28 0.00 0.00 0.28 <br /> TOTAL 2.78 0.00 0.00 2.78 <br /> NOTES: <br /> (1):TABLE 2 VALUES LAGGED USING AWAS <br /> (2):FOR WATER PLACED IN HENDERSON WATER SKI LAKE <br /> (3):INSTANTANEOUS ACCRETION TO RIVER FOR WATER PLACED IN PIPELINE TO RIVER <br /> Martin and Wood Water Consultants,Inc. <br /> Job No.762.2 9/7/2021 3:58 PM <br />