My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-18_PERMIT FILE - M2021050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021050
>
2021-10-18_PERMIT FILE - M2021050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:17 PM
Creation date
10/19/2021 1:33:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021050
IBM Index Class Name
Permit File
Doc Date
10/18/2021
Doc Name
Cost Estimate
From
DRMS
To
Jeff Chenoweth
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Ripping Access Road and Topsoil Stockpile Area <br />Site: J & P Caliche Pit Permit Action: M2021050 Permit/Job#: M2021050 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 10/15/2021 County: Baca <br />User: RAR <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3-Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Ownership Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Abbreviation: None <br />Filename: M050-003 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />$97.46 <br />Utilization % <br />NA <br />$97.63 <br />100 <br />$15.19 <br />NA <br />$9.94 <br />100 <br />$41.30 <br />NA <br />Total Fleet Cost/Hour: $261.52 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />$261.52 <br />Selected estimating method: Area <br />Seismic: NA Bank Volume: <br />Area: 1.50 acres Rip Depth (ft): <br />Source of estimated quantity: Site m <br />HOURLY PRODUCTION <br />Seismic: <br />NA <br />2.00 <br />BCY NA <br />Volume: 4,840 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.56 <br />feet/pass <br />Average Ripping Width: <br />7.08 <br />feet/pass <br />Average Ripping Length: <br />200.00 <br />feet/pass <br />Average Dozer Speed: <br />88.00 <br />feet/minute <br />Average Maneuver Time: <br />0.25 <br />minutes/pass <br />Production per unit area: <br />0.773 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.773 <br />Acres/hr <br />Site Altitude: <br />4,228 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.64 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.64 <br />Acres/hr <br />Caliche Pit#2 Cost Estimate October 2021 <br />4 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.