Laserfiche WebLink
-4 - <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) n Pastureland(PL) General Agriculture(GA) <br /> D Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> -0 Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13 Primary iwesent land (check on <br /> Cropland(CR) FM Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): Sub-aqueous excavation with <br /> track-mnuntprl hop <br /> 15. On Site Processing: Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Temporary stockpiling and drying of mined <br /> material via gravity drainage to mine pit. loading and truck haulage off site <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />