My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-20_GENERAL DOCUMENTS - C1983059
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1983059
>
2021-09-20_GENERAL DOCUMENTS - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 7:36:18 AM
Creation date
10/13/2021 7:35:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
9/20/2021
Doc Name Note
For SI2
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
JDM
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. OBSERVATIONS AND FINDINGS <br /> A reclamation cost estimate was completed with the 2021 Mid-term Review of the Terror Creek <br /> Loadout permit, on September 7, 2021. The estimated cost for completion of the approved <br /> reclamation plan is $215,014.00.A detailed reclamation cost estimate was forwarded to OMLLC <br /> and is also available for review at the Division office. <br /> The estimated cost of reclamation has increased due to the following: <br /> • Equipment operating and labor costs have increased since the reclamation cost estimate for <br /> the entire operation was calculated with Permit Revision No. I (PR-1). <br /> III. PROPOSED DECISION <br /> The current required surety for the site is $203,796.The Division is proposing to increase the <br /> required surety for the Terror Creek Loadout by$11,218,such that the required surety for the site <br /> will be $215,014. <br /> Any person with a valid legal interest which might be adversely affected by this proposed decision <br /> may request a formal public hearing before the Mined Land Reclamation Board in accordance with <br /> Rule 3.03.2(4). Public notice of this proposed decision will be published twice in the Delta County <br /> Independent as soon as possible. Requests for public hearing must be submitted to the Division in <br /> writing within thirty days of the date following the first publication in the Delta County <br /> Independent. If no hearing is requested within that thirty days,the Division's decision will become <br /> final. <br /> The Division currently holds a performance bond consisting of corporate sureties totaling$290,000; <br /> OMLLC will not be required to post additional bond to meet the proposed increase in required <br /> surety. <br />
The URL can be used to link to this page
Your browser does not support the video tag.