My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-12_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2021-10-12_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 2:12:18 AM
Creation date
10/13/2021 5:50:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
HYDROLOGY
Doc Date
10/12/2021
Doc Name
Hydrology Report
From
Energy Fuels
To
DRMS
Annual Report Year
2021
Report Quarter_Month
3
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Characterization of mine water in the Packrat Mine could not be conducted, because the mine is <br /> not yet accessible. Appendix 1, Attachment 3 of this report is reserved for field data collected <br /> from the Packrat Mine at such time that it becomes accessible and is monitored. <br /> DP Suring <br /> The field parameters were measured at DP Spring on July 13, 2021. The flow is measured by <br /> timing the fill rate of a five-gallon bucket. Field parameters from DP Spring are measured in the <br /> stock tank located at the spring. The field sampling form is provided in Appendix 3. A sample <br /> and a duplicate (referred to as Bear Spring) from DP Spring were collected during the 2021 <br /> annual sampling event. While not required, the data are included in Appendix 5 for informational <br /> ' purposes only <br /> Flow rates and field parameters at DP Spring are summarized in Appendix 1, Attachment 4. <br /> PR Spring <br /> The samples were collected and field parameters were measured at PR Spring on July 13, 2021. <br /> The flow is measured by timing the fill rate of a five-gallon bucket. Field parameters from PR <br /> ' Spring are measured in the stock tank located at the spring. The field sampling form is provided <br /> in Appendix 3. <br /> Flow rates and field parameters at PR Spring are summarized in Appendix 1, Attachment 5. The <br /> historical analytical data from PR Spring are summarized in Appendix 2,Table 2. <br /> Monitoring Well W-1 <br /> Monitoring Well W-1 was installed on October 12, 2008 for the purpose of characterizing and <br /> ' monitoring groundwater quality downgradient of the waste rock storage area. Samples were <br /> collected from Monitoring Well W-1 on July 13, 2021. W-1 was measured for the static <br /> groundwater level and field parameters on July 13, 2021. The water level at Monitoring Well <br /> ' W-1 is consistent with previous measurements. The field sampling form is provided in Appendix <br /> 3. <br /> Water levels and field parameters are summarized in Appendix 1, Attachment 6. The historical <br /> analytical data from Monitoring Well W-1 are summarized in Appendix 2,Table 3. <br /> Lumsden Canyon Seep <br /> The Lumsden Canyon Seep (also referred to in earlier reports as Lumsden Canyon Spring) was <br /> ' monitored for field parameters and sampled in June and December of 2008. This location was <br /> monitored by Western Water & Land, Inc. during hydrologic reconnaissance required by BLM <br /> stipulations to the Plan of Operations. No further sampling or field parameter measurement <br /> ' events are scheduled at this time. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.