Laserfiche WebLink
Lombard#3 Adequacy Review <br /> Page 3 of 5 <br /> September 17,2021 <br /> 14. Please specify where waste rock will be stockpiled and depict the stockpile location(s) on the Mining <br /> Plan Map. Map Information added. <br /> 15. Please specify how the adit will be safeguarded from unauthorized entry during active mining <br /> operations and during periods of seasonal closures. ne aoiL will oe cimberea and gateu. <br /> 16. The location map and Reclamation Plan Map indicate an existing waste rock area. Please clarify if <br /> the waste rock stockpile will be re-disturbed by the proposed mining activity. (-he existing waste <br /> rock pile will not be disturbed <br /> 17. The Mining Plan calls for moving 3-6 feet of overburden. Please clarify if the overburden is to be <br /> removed from the surface or from underground. Surfact In addition, please clarify if the proposed <br /> 3-6 feet of overburden is related to the 200 cubic yards of material which is proposed to be <br /> backfilled into the adit.The 3-6 ft of overburden is related to the 75 cubic yarn If the overburden is <br /> separate from the 200 cubic yards of backfill material,then specify the total volume of overburden <br /> to be stockpiled and depict the location of the overburden stockpile(s)on the Mining Plan Map. <br /> 18. The Division calculated the cost for an independent contractor to reclaim the site based on the <br /> information submitted by the Operator in the application at$25,000.00. After revisiting the <br /> excavation site with mt excavator we have revised the area of disturbance. Please revise the bond <br /> calculation.A copy of the Division's bond estimate is attached for review. <br /> 6.3.4 Exhibit D-Reclamation Plan <br /> 19. The Reclamation Plan calls for backfilling the adit after the completion of mining. Please specify the <br /> horizontal length of the adit, if known. Dimensions of the adit at this time are unknown.The Division will <br /> require the Operator to backfill the adit to a minimum depth of 15 feet from the top of the inner fill to <br /> the outer top of the fill. Agreed and understood There shall be no spaces between the top of the fill <br /> a and the roof of the adit that exceed three inches and there shall be no space between the top of the fill <br /> and the roof of the adit at the entrance of the adit. Please commit to following these guidelines when <br /> backfilling the adit.Agreed and Understood <br /> 20. Please identify the source of material to be used to backfill the adit and provide an estimate of the <br /> average size of rock which will be used for backfill material. The 75 yards of stockpiled material.The <br /> material size should range from dirt to 6 <br /> The Reclamation Plan states the final grade of the reclaimed slopes as 180H:180V and the Applicant <br /> states the existing grades will be matched. Please verify the existing grades are 1H:1V or revise the <br /> Reclamation Plan accordingly. Qevised <br /> 6.3.5 Exhibit E-Maps <br /> 22. The Applicant failed to provide a Mining Plan Map as required by Rule 6.3.5(2). Please provide a <br /> Mining Plan Map with the following requirements: <br /> a. outline and label the permit boundaries,described in Exhibit A-Legal Description <br /> b. label the names of owner(s)of record of the surface of the affected area and of the land within <br /> two hundred (200)feet of the affected area, identify the owner of the substance to be mined, <br /> and the type of structure and owners of record of any permanent or man-made structures <br /> within two hundred(200)feet of the affected area There are no man made structures within <br /> 200ft of the affected land. <br />