Laserfiche WebLink
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 1/1/2021 and completion: 1/1/2121 <br /> 2) How many years is the mine anticipated to be operational: 100 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits(check one): <br /> (f:])all-yearlong or([Z])seasonally,explain: Access will be available when snow has melted <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.918 acres <br /> 5) De th of topsoil to be salvaged(only for surface disturbances)(check one): <br /> 4-6 inches 6-8 inches <br /> -R8-10 inches RIO-12 inches <br /> —Other: <br /> M _N/A,explain: <br /> 6) Will you need to move any overburden(check one): (-0)Yes or(-a)No <br /> a. If yes,approximately how thick is the overburden? 3ft-6ft feet <br /> 7) How will the mine be accessed: (Z)existing roads(0)new roads will be created <br /> Please describe the existing roads: <br /> Existing Forest Sewirc Rn2de <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> No new rnadc <br /> 8) Will water be needed during the mining operation(check one): (J::[)Yes or( /�No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed(check one): (-D)Yes or(-WL)No <br /> a. If yes,please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process(check one): (-a)Yes or(-0)No <br /> a. If yes,please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br /> There will be no ore removed from the adit for milling or refining until until an ABA test is <br /> performed and a proper mining permit is issued by the DRMS. <br />