My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-07_PERMIT FILE - M2019041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019041
>
2021-10-07_PERMIT FILE - M2019041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:59:55 PM
Creation date
10/11/2021 6:16:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019041
IBM Index Class Name
Permit File
Doc Date
10/7/2021
Doc Name Note
Revised
Doc Name
Consent Agenda Summary Form
From
SEMA Construction
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> C,� 00 Division of Reclamation, � r <br /> Mining and Safetye <br /> Department of Natural Resources <br /> OCT 0 7 Z021 <br /> September 27, 2021 M O6S10N OF RCCININGgNpSAF�170;1 <br /> hETI' <br /> Gavin Madsen <br /> SEMA Construction, Inc. <br /> 7353 S Eagle St <br /> Centennial, CO 80112 <br /> Re: SEMA Construction, Inc., Motorcross Borrow Pit, File No. M-2019-041, <br /> Revised Consent Agenda Summary Form <br /> Mr. Madsen: <br /> A possible violation hearing is scheduled for consideration by the Mined Land Reclamation Board <br /> (Board). As indicated in the Division's correspondence dated August 12, 2021, Re: Reason to Believe a <br /> Violation Exists and Notice of Enforcement Hearing,the formal Board hearing was scheduled to occur <br /> during the September 22-23, 2021 meeting. During the September hearing, the Board continued the <br /> hearing for the possible violation to the October 20-21, 2021 Board meeting. <br /> Please find enclosed the Revised Staff Summary Form for Consent Agenda Items (consent form)for the <br /> possible violation at the site. If you concede to the violation, corrective actions and civil penalties, <br /> please affix your notarized signature on the enclosed consent form and return the signed form, with <br /> original signatures,to the Division no later than October 8, 2021. Upon receipt of the signed and <br /> notarized consent form the item will be moved from the Board's agenda for enforcement hearings to <br /> consent items and there will not be a formal Board hearing regarding the possible violation. <br /> However, if you wish to contest the possible violation or any of the conditions of the enclosed consent <br /> form, please inform the Division at your earliest convenience and do not sign the consent form. In the <br /> absence of a signed and notarized consent form,the formal Board hearing will proceed as scheduled for <br /> October 20-21, 2021. <br /> If you have any questions, please contact me at peter.hays@state.co.us or(303) 866-3567 Ext. 8124. <br /> Sincerely, <br /> Zeter . ays <br /> Environmental Protection Specialist <br /> Enclosure- Revised Staff Summary Form for the Consent Agenda Items <br /> Ec: Jared Ebert; Division of Reclamation, Mining&Safety <br /> -Ov,coo <br /> A, <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832,8106 https://drms.colorado.Qov I <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.