Laserfiche WebLink
IiI 11- ► <br />III I� ► <br />iIT. I� <br />1 I I II <br />III. II�-I e\ <br />►i i iii{ <br />II I ill? <br />E) <br />\�\\\ a <br />� 1 <br />illi II =III//� Il/11r <br />/i I ► II 11�1111j1 hili <br />PERMIT <br />i t 1 1r1l, <br />BOUNDARY <br />I i1l SWALE <br />ILII 11 h III;IIIIVII, i <br />III 1 V 11 IiI I IIIIiIIi� <br />I i l l 1 I I {N;(111111 I111111ti� <br />iI i i ✓ I � IILIIII'1j! Illlllltr <br />III -:III Ill IIiilllll( <br />� i C 1 Iil!lillll�ll`Illlihlif <br />i I I l i 111�IIIIiIIt►lllllll►111 <br />i I I I S III 1111111 llulllill <br />I I I I 111 illllli i IiI�ill �� <br />I I ! I III ►ullil �,I <br />I III i � ! Illi IIINII '�IIIII <br />1 iII �� � ►I.IIIIIIi 11!111 <br />! �'Q II' Ilulll iJill c� <br />1 ; I II� IiIIII�IIII N <br />i I w I II millI 'ill( <br />! Q ill 111111 1111' <br />I i--- II Mill fill <br />II� lliflllli(ll s: <br />1 � ',!' ulll1111111 <br />1 "' i II 111111 !111!1 <br />I I I ► II' IIIIVI IIIIIi <br />I i i l l II:� ullllilllll <br />I I i I II' Iliil"IIi{I <br />\,\ � i ! l �\� \ecce\ C ► \ \ 1 III I� <br />\\• � i � ecce I I . <br />e <br />til <br />Cf) �—Al <br />� <br />r \ � � t� �' I e\� \\ � ►lV � t I <br />/ \ PERMIT <br />J - BOUNDARY �\\� \ \ f1 0 I <br />INS \ <br />IAD \ •••\ a�, , \ v\\ \ \\�U �\t <br />vv <br />BOXELDER \ \\ <br />CREEK \ \ \ 100 \ \ \\\ <br />\ `;\ <br />CENTERLINE � \ '4�'}\ <br />\ \\\z 1 120'R.O.W <br />i t I t <br />\\Q <br />\•\ �j tt l :t <br />\ \ \ PROPOSED <br />\ \ " CENTERLINE OF <br />\ \ \ �► WEITZEL ROAD 1 I t I ' — _ = — — 7 <br />! ) f <br />SCREENING BERM \\ \ <br />i:1V RECLAIMED SLOPE/16\1 <br />ESERVOIR LINER - <br />\ PERMIT <br />BOUNDARY <br />50' SETBACK \ Jill I <br />l\� ISI► IljUlJill! <br />o <br />, <br />LEGEND - <br />GEND-PROPOSED <br />U <br />PROPOSED MAJOR CONTOUR <br />_4820— <br />4820PROPOSED <br />PROPOSEDMINOR CONTOUR <br />18 <br />EXISTING CONTOUR — <br />— — —5013— — — — <br />EXISTING RIGHT OF WAY <br />PERMIT BOUNDARY <br />100 -YEAR FLOODWAY (APPROXIMATE) <br />FRENCH DRAIN <br />UD— <br />LANDSCAPE NOTES: <br />SEEDING: <br />THINSPIKE WHEATGRASS (CRITANA) 5.5 - #PLS/AC. <br />SIDE -OATS GRAMMA (VAUGHN) 2.5 - #PLS/AC. <br />SWITCHGRASS (NEBR. 28) 1.5 - #PLS/AC. <br />ELEV = 4825' <br />3' FREEBOARD <br />/ \iCOMPAIE <br />,CLAY LAYER �\ / 0.5/1 <br />SI5.0' (MIN.) <br />\\ <br />L S N � <br />BEDROCK /\ <br />SCARIFIED PRIOR TO THE 10. D' <br />PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO <br />BE EXCAVATED AND REMOVED <br />FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL <br />BE REMOVED UNTIL COMPETENT <br />BEDROCK (AS DETERMINED BY <br />THE ONSITE ENGINEER) IS <br />EXPOSED. <br />11 <br />RECLAMATION NOT <br />1. SEEDING WILL BE ACCOMPLISHED BY DRILLING. <br />2. PLANTING WILL OCCUR IN THE FALL OR SPRING. <br />3. BERMS WILL AVERAGE 4 TO 5 FEET IN HEIGHT AND 40 TO 70 <br />FEET IN WIDTH AS SHOWN ON THE PLAN. <br />4. LANDSCAPING ALONG SOUTH AND WEST BOUNDARIES TO BE <br />COMPLETED PRIOR TO PHASE 2 MINING. <br />FRENCH <br />DRAIN <br />O <br />UNDISTURBED <br />SAND & GRAVEL <br />�Il <br />j ra I ISI► `��\ \\\ BOXELDER iA RESERVOIR LINER/GROUNDWATER CREEK COLLECTION TRENCH <br />CENTERLINE ►il I <br />i i 3 NOT TO SCALE <br />11111111 \ t 1 \� `� \• \ i <br />\� 1 EARTHWORK NOTES - <br />(j <br />i I I ► I / \\\�1.`� \ \ \ I 1. EACH LAYER OF FILL SHALL BE 4. AN 815 OR 825 SHEEPSFOOT 7. ALL BEDROCK MATERIAL SHALL <br />► I I I I i I ' 0`e \\�� \� V. <br />1 I SCARIFIED TO ALLOW PROPER ROLLER WILL BE USED FOR BE RIPPED, MOISTURE TREATED, <br />TOP OF LEVEE 4834' BONDING BETWEEN LAYERS. COMPACTING EFFORTS. AND ALLOWED TO AIR SLAKE <br />FOR A MINIMUM OF 1 DAY PRIOR <br />2. DENSITY AND MOISTURE 5. THE CLAY LINER MATERIAL TO ITS PLACEMENT IN THE LINER. <br />CONTENT TESTING SHALL BE SHALL BE MIXED IN THE <br />ALL BEDROCK MATEIAL <br />I► \\ \\\ ���� �` \\� \ \DONE AT A RATE OF 1 TEST FOR EMBANKMENT AT THE RATIO OF HAVE A MINIMUM OF75% PASSL <br />3H:1V RESERVOIR <br />LINER <br />► <br />` \\ II EACH 2000 YARDS PLACED. 4 PARTS CLAY OVERBURDEN <br />(CL) TO 1 PART SILTSTONE <br />THE #200 SIEVE PRIOR TO <br />\ fli �\ <br />3. ALL CLAY LINER MATERIAL BEDROCK. PLACEMENT IN THE <br />4s3a \\\ \ •• \ ►Il \ SHALL BE COMPACTED TO A EMBANKMENT. <br />I I ,III \\\` \ \ \�\\ \\ \\ \ \ MINIMUM 95% ASTM -D698-78 <br />6. THE CLAY LINER MATERIAL <br />a \ \ \\\\ \ \ �\ 7 <br />o 19 I I IiII 18" CULVERT \ \ i ' \ 8. ALL RANDOM FILL TO BE PLACED <br />(I I 1 \ \\ Q �� \ \ \ 11 / STANDARD PROCTER AT 2% OF SHALL BE PLACED IN A 9" (MAX.) WITH A MAXIMUM 9" LOOSE LIFT <br />Q I I`IllyI �\\\\� RECHARGE POND o `\� \ gb \ \ 8� &GATE , \'• \\ III r OPTIMUM MOISTURE CONTENT. LOOSE LIFT PRIOR TO AND COMPACTED TO A MINIMUM <br />III 111111 \\\\\ \m <br />0 LL <br />COMPACTION. OF 95% ASTM -D698-78 <br />STANDARD PROCTOR. <br />03 <br />=483 <br />a ll \\} <br />—4832• <br />W <br />— — <br />y <br />EXISTING <br />RECHARGE POND <br />100 YEAR FLOODWAY ► \ <br />\ GRADE —12 ---•� <br />— <br />ro <br />_ <br />—--- — <br />— — — — — — — — — — n _- — — -U RECHARGE POND 3 = _- — - 3 MINE <br />--, _ ---j PERMIT - <br />'g A RECHARGE POND OUTLET `�% BOUNDARY _/ / ( EXISTING 36" CMP <br />CI <br />RECHARGE POND OUTLET <br />TO EXISTING CULVERT <br />Ili► TO EXISTING DRAINIL f3 <br />— <br />i <br />5.0 (MIN.) <br />BEDROCK i i ►Ilii l it t -, Ij / / \\ 1 �\�\ SURFACE <br />IFIED <br />PRIOR TO THEPLACEM NT OF FILL <br />D <br />ILL <br />MATERIALS. ALL WEATHERED <br />Z10.0' \ 10.0' BEDROCK TO BE EXCAVATED AND <br />/ i I \\\\\ �` REMOVED FROM THE FOUNDATION. <br />► I I �II� `�`` \\ 11 I{ r I 1, I i i t WEATHERED BEDROCK SHALL BE <br />II <br />$ ~~ //l //� \\ \\ /` I \\\\ REMOVED UNTIL COMPETENT <br />�� \\1\ <br />BEDROCK (AS DETERMINED BY THE <br />g ONSITE ENGINEER) IS EXPOSED. <br />s � <br />t , <br />m <br />E rB <br />FLOODWAY DIVERSION BERM CROSS SECTION <br />0 <br />g' 3 NOT TO SCALE <br />iS o <br />¢ a <br />c O <br />FLOODWAY DIVERSION BERMNOTES: <br />N _ <br />o X <br />b 1. BERM LOCATION AND ALIGNMENT MAY BE SHIFTED NORTH AS NEEDED WITHOUT FLOODWAY IMPACT. <br />�a <br />2. BERM ELEVATION MAYBE HIGHER THAN INDICATED IF EXTRA OVERBURDEN MATERIALS ARE AVAILABLE. <br />z` LL 3. BERM WIDTH MAY BE WIDER THAN INDICATED WITHOUT FLOODWAY IMPACT IF ELEVATION IS NOT ABOVE <br />EXISTING GROUND TO THE SOUTH <br />Z <br />7 <br />hi <br />41 <br />C) <br />0 <br />0 <br />0 <br />z <br />N <br />U o <br />J C <br />a <br />0 <br />U) <br />civ c <br />til ag <br />�Oa <br />mn:(2 <br />U <br />Z <br />Z <br />0- <br />0 <br />(15 <br />�U- <br />F— <br />U <br />g Q <br />Z <br />:D <br />: <br />Wz <br />O <br />® <br />LLa <br />Qj <br />Z z <br />W <br />® <br />C) <br />W <br />c� <br />0 <br />Z <br />hi <br />41 <br />C) <br />0 <br />0 <br />0 <br />z <br />N <br />U o <br />J C <br />a <br />0 <br />U) <br />civ c <br />til ag <br />�Oa <br />mn:(2 <br />Date: SEPTEMB <br />Job No: 5 <br />Drawn: <br />Desi n: <br />Checked: B. SCHEN <br />Scale: 1» <br />Sheet: <br />KI <br />U <br />F— <br />Z <br />0- <br />(15 <br />F— <br />U <br />Z <br />:D <br />O <br />~ <br />W <br />W <br />Z <br />J <br />Z <br />W <br />O <br />Z <br />U <br />z <br />O <br />U <br />Date: SEPTEMB <br />Job No: 5 <br />Drawn: <br />Desi n: <br />Checked: B. SCHEN <br />Scale: 1» <br />Sheet: <br />KI <br />