My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-07_REVISION - M1977534
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977534
>
2022-10-07_REVISION - M1977534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2021 5:22:47 AM
Creation date
10/7/2021 9:28:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977534
IBM Index Class Name
Revision
Doc Date
10/7/2022
Doc Name
Adequacy Review Response
From
City of Golden
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision 04 <br />Empire Pit <br />Reclamation Permit No. M-1977-534 <br />Response to Adequacy Reviews <br />September 1, 2021 Adequacy Review Response <br />The following are the City of Golden's responses to issues raised in the Divisions September 1, 2021 <br />Adequacy Review: <br />1. The Operator proposes to re-establish an access road along the east fence line of the pasture at <br />the request of the property owners. The Division believes based on the map submitted with the <br />technical revision the Operator intends to re-establish an access road along the west fence line <br />permit boundary. Please review the statement and revise the technical revision accordingly. <br />Response: The Division is correct. Golden proposes to re-establish an access road along the east <br />side of the west fence line. The technical revision has been revised accordingly and is attached. <br />2. Please provide typical construction details for the proposed access roads and turn around area. <br />Response: Construction details for the access road and turn around area are attached to this <br />response. <br />3. The Operator states, where needed, the liner will be anchored under the road in such away to <br />prevent migration. Please explain and provide details regarding how the geosynthetic clay liner <br />will be anchored under the new access road adjacent to the saline soil revegetation area. <br />Response: Construction details showing how the geosynthetic clay liner will be installed to <br />prevent migration are attached to this response. The liner will be anchored per manufacturer's <br />recommendations. <br />4. The Operators states that drainage will be redirected from the site that is currently causing <br />minor erosion on the road that connects the reclamation area to the property to the north. <br />Please describe the drainage improvements and indicate the location of the improvements on <br />the revised Reclamation Plan Map. <br />Response: Erosion on the road appears to be the result of a small rock check dam that has been <br />installed on the road and a drainage ditch located on the south side of the road. The check dam <br />runs through the drainage ditch from the southwest to the northeast and appears to direct flow <br />from the ditch onto the road. Golden proposes to reverse the check dam and stop flows from <br />
The URL can be used to link to this page
Your browser does not support the video tag.