My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-06_REVISION - M2010001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010001
>
2021-10-06_REVISION - M2010001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:50:54 PM
Creation date
10/7/2021 8:15:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010001
IBM Index Class Name
REVISION
Doc Date
10/6/2021
Doc Name
Consent Agenda Summary Form
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` COLORADO <br /> © Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> September 27,2021 <br /> Gavin Madsen <br /> SEMA Construction, Inc. <br /> 7353 S Eagle St <br /> Centennial,CO 80112 <br /> Re: SEMA Construction,Inc., Motorcross Borrow Pit,File No. M-2019-041, <br /> Revised Consent Agenda Summary Form <br /> Mr. Madsen: <br /> A possible violation hearing is scheduled for consideration by the Mined Land Reclamation Board <br /> (Board). As indicated in the Division's correspondence dated August 12,2021, Re: Reason to Believe a <br /> Violation Exists and Notice of Enforcement Hearing,the formal Board hearing was scheduled to occur <br /> during the September 22-23, 2021 meeting. During the September hearing,the Board continued the <br /> hearing for the possible violation to the October 20-21, 2021 Board meeting. <br /> Please find enclosed the Revised Staff Summary Form for Consent Agenda Items(consent form)for the <br /> possible violation at the site. If you concede to the violation,corrective actions and civil penalties, <br /> please affix your notarized signature on the enclosed consent form and return the signed form,with <br /> original signatures,to the Division no later than October 8, 2021. Upon receipt of the signed and <br /> notarized consent form the item will be moved from the Board's agenda for enforcement hearings to <br /> consent items and there will not be a formal Board hearing regarding the possible violation. <br /> However, if you wish to contest the possible violation or any of the conditions of the enclosed consent <br /> form, please inform the Division at your earliest convenience and do not sign the consent form. In the <br /> absence of a signed and notarized consent form,the formal Board hearing will proceed as scheduled for <br /> October 20-21, 2021. <br /> If you have any questions, please contact me at peter.hays@state.co.us or(303)866-3567 Ext.8124. <br /> Sincerely, <br /> Deter S. Hays <br /> Environmental Protection Specialist <br /> Enclosure-Revised Staff Summary Form for the Consent Agenda Items <br /> Ec: Jared Ebert; Division of Reclamation, Mining&Safety <br /> o coy <br /> 0 <br /> ,4ti •p <br /> O <br /> 1313 Sherman Street, Room 215, Denver,CO 80203 P 303.866.3567 F 303.832.8106 https://drms.colorado.aov <br /> Jared S. Polis,Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director .j87•# <br />
The URL can be used to link to this page
Your browser does not support the video tag.