My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-05_REVISION - M2000118
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000118
>
2021-10-05_REVISION - M2000118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:50:08 PM
Creation date
10/6/2021 6:19:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000118
IBM Index Class Name
REVISION
Doc Date
10/5/2021
Doc Name
Incompleteness Response
From
Oldcastle SW Group
To
DRMS
Type & Sequence
SO2
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structure Agreement <br /> This letter has been provided to you as the owner of a structure on or within two hundred(200)feet <br /> of a proposed mine site. The State of Colorado, Division of Reclamation, Mining and Safety <br /> ("Division") requires that where a mining operation will adversely affect the stability of any <br /> significant, valuable and permanent man-made structure located within two hundred (200) feet of the <br /> affected land, the Applicant shall either: <br /> a) Provide a notarized agreement between the Applicant and the Person(s) having an interest in <br /> the structure, that the Applicant is to provide compensation for any damage to the structure; <br /> or <br /> b) Where such an agreement cannot be reached,the Applicant shall provide an appropriate <br /> engineering evaluation that demonstrates that such structure shall not be damaged by <br /> activities occurring at the mining operation;or <br /> c) Where such structure is a utility, the Applicant may supply a notarized letter,on utility <br /> letterhead, from the owner(s)of the utility that the mining and reclamation activities, as <br /> proposed, will have"no negative effect"on their utility. (Construction Materials Rule 63.12 <br /> and Rule 6.4.19& Hard Rock/Metal Mining Rule 6.3.12 and Rule 6.4,20) <br /> The Colorado Mined Land Reclamation Board("Board') has determined that thisform, ifproperlv <br /> executed, represents an agreement that complies with Construction Materials Rule 6.3.12(a), Rule <br /> 6.4.19(a), and C.R.S. §34-32.5-115(4)(e) and with Hard Rock/Metal Mining Rule 6.3.12(a), Rule <br /> 6.4.20(a), and C.R.S. §34-32-115(4)(d). This form is for the sole purpose of ensuring compliance <br /> with the Rules and Regulations and shall not make the Board or Division a necessary party to any <br /> private civil lawsuit to enforce the terms of the agreement or create any enforcement obligations in <br /> the Board or the Division. <br /> The following structures are located on or within 200 feet of the proposed disturbed area: <br /> 1. Power Lines and poles in accordance with the letter dated November 6, 2000, a copy of <br /> which is attached to this Structure Agreement, replacing D.G. Huskin Construction Co., <br /> prior owner to APC Southern Construction Co, LLC, with Oldcastle SW Group, Inc. <br /> DBA APC Southern Construction Co. <br /> 2. <br /> 3. <br /> 4. <br /> 5. <br /> (Please list additional structures on a separate page) <br />
The URL can be used to link to this page
Your browser does not support the video tag.