My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-29_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
2021-09-29_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 1:53:18 PM
Creation date
9/30/2021 4:45:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/29/2021
Doc Name
Revision Required
From
Climax Molybdenum
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
po Molybdenum Climax Mine <br /> >` ° ® ClimaxMlbd y HWY 91 - Fremont Pass <br /> A Freeport-McMoRan Company Climax, CO 80429 <br /> Phone (719) 486-2150 <br /> Fax(719) 486-2251 <br /> September 24,2021 7D <br /> Mr.Lucas West SEP 2 y 20 <br /> Division of Reclamation,Mining and Safety 21 <br /> Department of Natural Resources DIVISION OF`1!:CLAMATION <br /> 1313 Sherman St. Room 215 MINING AND SAFETY <br /> Denver, Colorado 80203 <br /> Re: M-1977-493,Climax Mine,Permit No. M-1977-493,Revision Required <br /> Dear Mr. West: <br /> Climax would like to thank you for the opportunity to meet with you on September 7, 2021 to <br /> discuss your letter dated June 22, 2021 regarding designated chemical storage and Environmental <br /> Protection Facilities(EPF)associated with the mill. We would like to confirm our understanding <br /> of the next steps. <br /> Climax appreciated the constructive discussion in which it was confirmed that the Division's <br /> focus for purposes of review and permit revision is providing adequate containment of designated <br /> chemicals, and not a change in the milling processes. Climax understands that the Division <br /> requests a consolidation of information existing in separate earlier submittals and approvals with <br /> additional information. <br /> Climax stores designated chemicals in the mill,the storage and containment of which is regulated <br /> by DRMS. The apron of the mill building serves as a secondary containment for the designated <br /> chemicals used in the building and is an EPF under the existing EPP.As a result, Climax will <br /> provide the following information on this EPF: <br /> • Climax proposed to provide a general description of the mill process. Some of this <br /> information is already included in AM-06,but to meet the Division's interest in having <br /> information in one place, Climax will provide a submission that summarizes this information <br /> that may include more detail from AM-06 in an attachment. <br /> • As to environmental protection facilities,Climax agreed to provide: <br /> o A summary of construction on the building apron, including a drawing. This drawing <br /> does not have to be stamped by a professional engineer. <br /> o Information on any coatings that may have been applied to concrete at the time of <br /> construction,which also serve as containment. <br /> o A summary of calculations to demonstrate that the various EPFs can contain <br /> materials spilled in the event of a failure of equipment in the building, including the <br /> designated chemical storage area. <br /> The Division indicated that they are also interested in receiving information on the geochemistry <br /> of tailings material generated from the mill. Climax and the Division agreed during the meeting <br /> that TCLP is not the appropriate methodology to characterize tailings material. Climax will <br /> submit information on tailings geochemistry provided in earlier submittals. <br /> {00912573.1} <br />
The URL can be used to link to this page
Your browser does not support the video tag.