My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-28_REVISION - M2010058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010058
>
2021-09-28_REVISION - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2021 5:30:18 AM
Creation date
9/29/2021 9:37:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
Revision
Doc Date
9/28/2021
Doc Name
Approval Document
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
TR2
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont’d Task # 02A Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br /> <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 6300 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />0.830 <br />Travel Time: <br /> Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) Travel Time <br />(min) <br />1 850.00 4.00 3.00 7.00 1362 0.70 <br />Haul Time: 0.70 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) Travel Time <br />(min) <br />1 850.00 -4.00 3.00 -1.00 2972 0.36 <br />Return Time: 0.36 minutes <br />Total Scraper team cycle time: 2.66 minutes <br />Adjusted for job conditions: 1,085.86 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,085.86 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 2,171.73 LCY/Hour <br />Unadjusted unit production/hour: 1,308.27 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: 138.12 Hours <br /> <br />Unit cost: <br /> <br />$1.298 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$389,278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.