My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-28_REVISION - M2010058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010058
>
2021-09-28_REVISION - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2021 5:30:18 AM
Creation date
9/29/2021 9:37:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
Revision
Doc Date
9/28/2021
Doc Name
Approval Document
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
TR2
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: TR2 Cost update <br />Site: Cerise Mine Permit Action: TR2 Permit/Job#: M2010058 <br /> <br />PROJECT IDENTIFICATION <br />Task #: ACY State: Colorado Abbreviation: None <br />Date: 9/27/2021 County: Garfield Filename: M058-ACY <br />User: ACY <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />01a Demo scale house DEMOLISH 1 8.00 $2,344 <br />02a Transport backfill from Phase 1C to Phase 1A SCRAPER1 2 138.12 $389,278 <br />02b Transport backfill from Phase 1C to Phase 1B SCRAPER1 2 65.04 $172,466 <br />03a Rip compacted areas RIPPER 2 6.95 $4,723 <br />04a Transport topsoil SCRAPER1 2 20.70 $58,252 <br />04b Finish grading transported topsoil DOZER 4 7.83 $9,669 <br />05a Hay seed mix- Table L-1 REVEGE 1 50.00 $59,148 <br />05b Native seed mix- Table L-1 REVEGE 1 15.00 $19,825 <br />06a Initial mobilize reclamation crew/equipment MOBILIZE 1 2.88 $10,529 <br />06b Secondary mobilize reclamation crew/equipment MOBILIZE 1 2.88 $1,516 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />317.4 <br /> <br />$727,750 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $14,701 <br />Performance bond: 1.05 Total = $7,641 <br />Job superintendent: 158.70 Total = $11,431 <br />Profit: 10.00 Total = $72,775 <br /> TOTAL O & P = $106,548 <br /> CONTRACT AMOUNT (direct + O & P) = $834,298 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): $500 Total = $500 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $35,458 <br />Reclamation management and/or administration: 5.00 $41,715 <br /> <br />CONTINGENCY: 0.00 Total = $0 <br /> <br />TOTAL INDIRECT COST = $184,221 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $911,971 <br />
The URL can be used to link to this page
Your browser does not support the video tag.