Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: <br /> Site: Colowyo Coal Mine Permit Action: MR238 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 9/27/2021 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Load,Haul and Regrade Collom Topsoil from 25A TRUCKI 1 9.14 $45,695 <br /> 002 Reseed Collom Pit and Temporary Spoil Pile REVEGE 1 6.00 $7,210 <br /> SUBTOTALS: 15.14 $52,905 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,069 <br /> Performance bond: 1.05 Total= $556 <br /> Job superintendent: 7.57 Total= $545 <br /> Profit: 10.00 Total= $5,290 <br /> TOTAL O&P= $7,460 <br /> CONTRACT AMOUNT(direct+O&P)= $60,365 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $1,207 <br /> Reclamation management and/or administration: 1.91 $1,153 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $9,820 <br /> TOTAL BOND AMOUNT(direct+indirect)= $62,725 <br />