My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-27_REVISION - M1976007UG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976007
>
2021-09-27_REVISION - M1976007UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:42:05 PM
Creation date
9/27/2021 6:13:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976007UG
IBM Index Class Name
Revision
Doc Date
9/27/2021
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Environmental Alternatives Inc.
Type & Sequence
CN1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Angela Bellantoni <br /> September 21,2021 <br /> Pages of10 <br /> (c)A description of how the Reclamation Plan will be implemented to meet each applicable requirement <br /> of Section 3.1; <br /> (d)Where applicable,plans for topsoil segregation,preservation, and replacement; for stabilization, <br /> compaction,and grading of spoil; and for revegetation. The revegetation plan shall contain a list of the <br /> preferred species of grass, legumes, forbs, shrubs or trees to be planted,the method and rates of seeding <br /> and planting, the estimated availability of viable seeds in sufficient quantities of the species proposed to <br /> be used,and the proposed time of seeding and planting; <br /> (e)A plan or schedule indicating how and when reclamation will be implemented. Such plan or schedule <br /> shall not be tied to any specific date but shall be tied to implementation or completion of different stages <br /> of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br /> (i)An estimate of the periods of time which will be required for the various stages or phases of <br /> reclamation; <br /> (ii)A description of the size and location of each area to be reclaimed during each phase; and <br /> (iii)An outline of the sequence in which each stage or phase of reclamation will be carried out. <br /> (The schedule need not be separate and distinct from the Reclamation Plan,but may be <br /> incorporated therein.) <br /> (f)A description of each of the following: <br /> (i)Final grading-specify maximum anticipated slope gradient or expected ranges thereof; <br /> (ii) Seeding- specify types, mixtures, quantities,and expected time(s) of seeding and planting; <br /> (iii)Fertilization-if applicable, specify types, mixtures, quantities and time of application; <br /> (iv)Revegetation- specify types of trees, shrubs, etc., quantities, size and location;and <br /> (v)Topsoiling- specify anticipated minimum depth or range of depths for those areas where <br /> topsoil will be replaced. <br /> • Please provide a weed control plan for the site during mining and reclamation activities. The plan <br /> should include at a minimum what species are expected and how they will be controlled/eradicated. <br /> • The reclamation plan mentions plugging inactive underground mine adits with interburden material. <br /> Where are these adits located(show on map as appropriate), and what are the approximate <br /> dimensions/expected volume(s)of fill required? <br /> EXHIBIT F-Reclamation Plan Map(Rule 6.4.6): The map(s)of the proposed affected land,by all phases of <br /> the total scope of the mining operation, shall indicate the following: <br /> (a)The expected physical appearance of the area of the affected land,correlated to the proposed mining and <br /> reclamation timetables. The map must show proposed topography of the area with contour lines of sufficient <br /> detail to portray the direction and rate of slope of all reclaimed lands; and <br /> (b)Portrayal of the proposed final land use for each portion of the affected lands. <br />
The URL can be used to link to this page
Your browser does not support the video tag.