My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-27_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-09-27_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 2:02:19 AM
Creation date
9/27/2021 4:35:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
9/27/2021
Doc Name
Adequacy Review Response
From
The Union Milling Contractors
To
DRMS
Type & Sequence
CN1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-1990-057 Attachment <br /> Reclamation Cost Estimate <br /> Leadville Mill <br /> Lake County,Colorado <br /> Task 5 Remove Mill Equipment No. Task Description - - Cost Notes <br /> alit—all mul eqW_-,from:ae.Equipmem 1 Coarse Ore Bin&Grizzly $ 1,825.D0 <br /> h salvaged,sent tp reryde yard 1 mile west of <br /> propem o�High—24. 2 Crusher $ 1,500.00 <br /> b)auilding/shuc[uee will remain for post-mIflhng 3 Conveyors(1 Bucket&5 Belt <br /> indu:vial use. Units) $ 1,875.00 <br /> CIA.:pmesall eo�ipmenrs,awage.moo 4 Fine Ore Bin $ 2,675.00 Other cost is torch cutting, <br /> equipment will.however,have economir value. <br /> 5 Ball Mill $ 2,225.00 <br /> 6 Dust Collector&Ductwork $ 1,275.00 <br /> 7 Water Storage Tanks $ 1,150.00 <br /> 8 Hydrocylcones $ 750.00 <br /> 9 Conditioning Tank $ 425.00 <br /> 10 Gravity Circuit(Concentrator <br /> &Table) $ 450.00 <br /> 11 Flotation Cells $ 1,075.00 <br /> 12 Concentrate Thickener $ 925.00 <br /> 13 Filter Press $ 1,375.00 <br /> 14 Tailings Thickener $ 1,075.00 <br /> 15 Disk Filter $ 875.00 <br /> 16 Concentrate Hopper $ 425.00 <br /> 17 Air Compressor $ 350.00 <br /> 18 Receiver Tank 1$ 475.00 <br /> 19 Pumps&Piping $ 1,950.00 <br /> 20 Building) $ 525.00 <br /> 21 Dump Fee $ 3,000.00 <br /> Task 5:Remove Mill Equipment $ 26,200.00 <br /> Task 6 Mobilization& Round Cost <br /> No. Description - Notes <br /> Demobilization Trips 1$1 <br /> 1 Tractor/Lowboy 4 $ 2,200.00 Rental rates include labor and contractor margins <br /> 2 Front-End Loader 1 $ 60.00 <br /> 3 Bulldozer 1 $ 60.00 <br /> 4 Water Truck 1 $ 60.00 <br /> 5 Boom Truck 1 $ 60.00 <br /> Task 6 Mobilization&Demobilization $ 2,440.00 <br /> Page 5 of 5 <br /> Append ix_5-2_Reclamation Cost Summary(ARiResponse).xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.