My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-24_PERMIT FILE - M2021005
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021005
>
2021-09-24_PERMIT FILE - M2021005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:34:28 PM
Creation date
9/27/2021 5:32:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021005
IBM Index Class Name
PERMIT FILE
Doc Date
9/24/2021
Doc Name
Adequacy Review Response #2
From
Bent County
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BENT COUNTY COMMISSIONERS <br /> 112 PERMIT APPLICATION <br /> EXHIBIT D (Mining Plan) <br /> Bent Co State Pit <br /> Mining will commence on the western edge of the affected area then proceed to the northeast as <br /> shown in the Exhibit C- Mining Plan map. Mining will be performed using front end loaders.The deposit <br /> is approximately 3 feet thick located between 1 and 4 feet below the surface of the mined area. No <br /> explosives will be used in the mining operation. <br /> Approximately 3 to 10 inches of topsoil will be removed and collected along the northern boundary of <br /> the affected area for use during reclamation as shown on Exhibit C2. Additional overburden ranging <br /> from a few inches to up to 3 feet will be removed, collected, and stored along the northern boundary of <br /> the affected area as shown on Exhibit C2 for use during reclamation as needed.The topsoil and <br /> overburden materials will be isolated and stabilized with a faster growing subset of the reclamation seed <br /> mix(e.g. sideoats gramma and sand dropseed) for use during reclamation. Mining will be performed as <br /> needed over several years. Reclamation activities will be performed as mining progresses. <br /> Approximately 3 acres will be used for staging and stockpiling of mined material. Mined area will be <br /> reclaimed when 3 acres of mined area is available for reclamation. Approximately 16 acres of the <br /> affected land will be mined over time with approximately 5 acres being actively mined, reclaimed, or <br /> used for stockpiles. <br /> No secondary commodities will be mined from the affected area. <br /> The front wall of the mined areas will be sloped by front end loader to a 45-degree angle. Mined areas <br /> will be sloped to a slight grade sufficient to reduce rainwater collection. Approximately 3 acres will be <br /> mined per year. Screening and crushing of the mined material may occur annually or biennially.The <br /> screened materials will be stockpiled in the mined area of the affected pit area. Pit operation shall be <br /> intermittent with approximately 2 months of mining and screening per year or every other year. <br /> Stockpiled material will be used as needed, but total activity will be less than 180 days per year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.