My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-20_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-09-20_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:25:49 PM
Creation date
9/20/2021 7:49:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
9/20/2021
Doc Name
Adequacy Review Response #2
From
Ouray Silver Mines, Inc.
To
DRMS
Type & Sequence
TR16
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AFL INDUSTRIES,INC. <br /> RIVIERA BEACH,FLORIDA <br /> SERVICE INSTALLATION INSTRUCTIONS PAGE 1 OF 6 <br /> MANUAL <br /> PRODUCT: ROTARY PIPE SKIMMER <br /> MODEL: RPS <br /> GENERAL <br /> Refer to manual skimmer assembly drawing on a specific tank installation included in this brochure. It will be helpful to become <br /> familiar with part names and their location. <br /> NOMENCLATURE <br /> The letter following the AFL model, RPS, designates the axis about which the skimmer rotates. The model described in <br /> this instruction is RPS,or concentric axis and designates skimmer rotation about centerline of skimmer pipe which coincides with <br /> oil outlet pipe centerline. See Fig. 1.0 for a typical skimmer assembly and component parts. <br /> SKIMMER COMPONENTS <br /> Model RPS skimmers consist of five major components as described below and shown in Fig. 1 and 2. <br /> 1. Skimmer pipe with 90 degree slots, Item 3 <br /> 2. Mounting bracket complete with a trunion,Item 2 <br /> 3. Compression coupling,Item 4,as shown in Fig. 1,Fig.2,&Fig.3 <br /> 4. Outlet discharge connection,Item 1 <br /> Note: Item 1, discharge connection is required connection is required on constructed, Duo-Wal`m units or <br /> existing/new structures. On molded AFL units,the discharge connection is replaced by compression coupling. <br /> See Fig.2 and Fig.3. <br /> 5. Adjustment handle,Item 5 <br /> 5 4 <br /> 2 3 <br /> A y <br /> SUPERSEDES: 1-O-M: 7.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.