Laserfiche WebLink
AFL INDUSTRIES,INC. <br /> RIVIERA BEACH,FLORIDA <br /> SERVICE INSTALLATION Page 3 OF 8 <br /> MANUAL INSTRUCTIONS <br /> PRODUCT: VERTICAL TUBE COALESCING <br /> SEPARATORS <br /> MODELS: ALL UNITS <br /> PIPE CONNECTIONS <br /> 1. All flanged unit connections,unless otherwise noted,provided by AFL are flat-face design. <br /> 2. All piping runs to and from AFL units must be independently supported in order to eliminate strain and stress due to soil <br /> conditions or due to pipe contractions and expansions. <br /> 3. For plain end connections,use the customer-specified attachment. <br /> If the separator is to be anchored to the concrete slab, make sure the anchor bolts are placed according to orientation drawing <br /> included in this brochure. <br /> NOTE: Sufficient distance between the separator location and any piping to separator must be provided <br /> for proper working clearance. <br /> INSTALLATION <br /> 1. Upon arrival,check the separator for any visible damage. Report any damage to the driver. Also see General Instructions <br /> 1-0-M:0.01 for additional information. <br /> 2. Lift separator from trailer with crane by connecting chains or cables to the lifting straps provided with the separator. See <br /> drawings and specifications in this brochure for number of straps provided/required. <br /> WARNING:IF LIFTING LUGS ARE PROVIDED,USE SPREADER BARS TO ELIMINATE <br /> ANY SIDE FORCES ON LIFTING LUGS.FORCE ON LUGS MUST BE APPLIED <br /> IN VERTICAL DIRECTION ONLY. ANY SIDE FORCE ON LIFTING LUGS <br /> MIGHT DAMAGE TANK CONSTRUCTION. SEE FIG.2.0 FOR PROPER <br /> CABLE/HOOK ATTACHMENT TO LIFTING LUGS. <br /> 3. Set separator in place; see Fig.3.0,4.0,and 5.0. <br /> SUPERSEDES: 1-0-M: 2.00-02 <br />