Laserfiche WebLink
Page 3 of 13 <br /> <br />Application <br /> <br />Cost /Acre <br />Description <br />Drill Seeding (DRMS Survey Cost) $232.00 <br /> <br /> <br />Total Seed Application Cost/Acre <br />$232.00 <br /> <br />MULCHING and MISCELLANEOUS <br /> <br />Materials <br /> <br />Units / <br />Cost / Unit Cost /Acre <br />Description Unit <br />Acre <br />Straw, delivered {MEANS 31 25 14.16 1200} 2.00 TON $307.02 $614.04 <br /> <br /> <br /> <br /> <br /> <br />Total Mulch Materials Cost/Acre <br />$614.04 <br /> <br />Application <br /> <br />Cost /Acre <br />Description <br />Crimping, with tractor {DMG survey data} $71.57 <br />Power mulcher (MEANS 32 91 13.16 0350) $106.29 <br /> <br /> <br />Total Mulch Application Cost/Acre <br />$177.86 <br /> <br />NURSERY STOCK PLANTING <br /> <br /> <br />No / Planting <br />Fertilizer <br />Type and Size <br />Cost /Acre <br />Common Name <br />Pellet Cost <br />Acre Cost <br /> <br /> $ <br /> <br />Totals Nursery Stock Cost / Acre $0.00 <br /> <br />JOB TIME AND COST <br /> <br />No. of Acres: 55 Cost /Acre: $1,357.66 <br />Estimated Failure Rate: 25% Cost /Acre*: $1,357.66 <br />*Selected Replanting Work Items: FERTILIZING,SEEDING,MULCHING <br /> <br />Initial Job Cost: <br />$74,671.30 <br />Reseeding Job Cost: <br />$18,667.83 <br />Total Job Cost: <br />$93,339 <br />Job Hours: <br />0.00 <br /> <br /> <br />CIRCES Cost Estimating Software <br /> <br />