Laserfiche WebLink
Task # 01 Page 13 of 13 <br /> <br />EQUIPMENT HAUL DISTANCE and Time <br /> <br />Nearest Major City or Town within project area region: GREELEY <br />COLORADO <br />Total one-way travel distance: 20.00 miles <br />Average Travel Speed: 20.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />$23,082.90 <br /> <br />Total Roadable Mob/Demob Cost ** <br />$97.48 <br />** one round trip, no haul rig: <br /> <br />Transportation Cycle Time: <br /> <br /> Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 1.00 1.00 <br />Return Time (Hours): 1.00 1.00 <br />Loading Time (Hours): 2.00 NA <br />Unloading Time (Hours): 2.00 NA <br />Subtotals: 6.00 2.00 <br /> <br />JOB TIME AND COST <br /> <br />Total job time: Hours <br /> 12.00 <br /> <br /> <br /> <br />Total job cost: <br />$23,180 <br /> <br /> <br />CIRCES Cost Estimating Software <br />