Laserfiche WebLink
The active mining face will extend no more than 2,300 feet in length. During mining <br /> and prior to reclamation in the West and East Areas, the mine walls will be a nearly <br /> vertical to '/2H:1V slope (see Exhibit C, Mining Maps). Mining will progress down to <br /> the depth of quality aggregate material. Backfilling and/or grading of side slopes may <br /> follow behind the mining activities before mining in the Area is complete. Concurrent <br /> reclamation will be practiced when the highwall reaches the mine limit. During the <br /> flood season April 1 through September 30 and when the highwall is within 400 feet <br /> or less of the river the highwall will be no steeper then 3H:1V. <br /> As mining progresses, topsoil, overburden, and non-marketable materials will be <br /> removed and stockpiled for use in reclamation activities. Overburden from the West <br /> Area and East Areas will be used in reclamation. Should there be excess <br /> overburden on these cells, the material will be conveyed to the Platte Valley site for <br /> reclamation or to be sold. During mining in the West and East Areas, topsoil will be <br /> segregated and stockpiled in the locations shown on Exhibit C Mining Maps, i.e. <br /> outside of the Floodway. As mining progresses, overburden will be taken directly to <br /> mined out slopes for use in reclamation. Topsoil and overburden stockpiles will be <br /> configured to have side-slopes no steeper than 3H:1 V. If the stockpiles are inactive <br /> for more than one growing season, such as the stockpiles used for screening, they <br /> will be seeded with the fast-growing grass seed mixture below. <br /> Stockpile Grass Seed Mixture <br /> Grass Species Rate <br /> (#PLS/ac <br /> Luna Pubescent Wheatgrass 15.0 <br /> Amur Intermediate Wheatgrass 15.0 <br /> Rates are for broadcast seeding. <br /> Other than those used for screening, long-term stockpiles are not anticipated. <br /> Temporary stockpile materials will continually be used for reclamation and the <br /> stockpiles will likely be disturbed on a frequent basis and seeding the stockpiles <br /> may not be practical during the operation. If stockpile seeding is not used, surface <br /> roughening will be maintained to limit wind and water erosion. <br /> Most of the proposed Tucson South Resource Permit Boundary Area is within the <br /> regulatory floodplain of South Platte River. Because of floodplain regulatory <br /> restrictions, stockpiling will occur within a mining Area whenever possible with the <br /> top of stockpile elevation lower than the pre-project grade. Stockpiles within the <br /> modeled floodplain above the existing ground surface will generally be created <br /> parallel to potential South Platte River flood flows. The stockpiles will be no longer <br /> than 300 feet, with minimum spacing of 100 feet between stockpiles for flood flows <br /> to pass (see Exhibit C, Mining Maps). The screening stockpiles along Highway 7 as <br /> Aggregate Industries—Tucson South Amendment—MLRB 112 Permit Application <br /> Exhibit D-6 <br />