Laserfiche WebLink
and gravel materials, clay, silt, and other non-marketable materials excavated from <br /> the proposed permit area will be used on-site for reclamation. <br /> The mining plan currently includes mining in two phases. Mining may occur <br /> simultaneously in more than one phase. The actual sequence may change <br /> depending on market conditions, operational needs, or site conditions: <br /> • West Area (Phase 1), is located north of Highway 7 and west of Tucson Street and <br /> included Tracts A, B and C <br /> • East Area (Phase 2) is north of Highway 7 and east of Tucson Street and includes Tracts <br /> D, E, F, G and H <br /> Tracts N, O, P, Q, R, and S will contain the conveyor to export product off-site to the <br /> Wattenberg Lakes Site and will be used during all mining phases. <br /> Mining will begin in the West Area (Phase 1). Once mining is complete in the West <br /> Area, mining will commence in the East Area (Phase 2). All necessary permits will <br /> be obtained. A summary of mining phases is presented in the table below. <br /> Processing and sale of the material will occur on the Platte Valley site (M-1989- <br /> 120). Overburden from the West and East Areas will be used to reclaim the cells. If <br /> there is excess overburden material, the material will be conveyed to the Platte <br /> Valley site and Wattenberg Lakes site for reclamation. <br /> A slurry wall will be constructed around the East and West Areas prior to exposure <br /> of the water table. The slurry wall has been designed and is attached to this exhibit. <br /> Mine Phasing Summary <br /> Mine Phase Total Duration <br /> Acreage To be ears <br /> West 72.0 4 <br /> East 83.8 4 <br /> Tot 155.8 8 <br /> Mining Methods <br /> The method of mining used within the permit boundary: <br /> • The slurry wall liner for the West and East Areas will be installed prior to <br /> exposure of ground water at the site. Once the slurry wall is installed the West <br /> and East Areas will be dewatered. The deposit will be dry mined using <br /> dewatering trenches and pumps within the slurry lined area. Prior to excavation <br /> of each mining phase, trenches will be cut along the perimeter of the <br /> excavation to begin dewatering the sand and gravel material. The trenches will <br /> extend through the overburden and alluvium to bedrock. Pumps will be used to <br /> remove the groundwater that drains from the deposit within the lined <br /> excavation. If necessary, water from the trenches will be circulated through a <br /> settling pond prior to being discharged to adjacent drainage ditches and/or the <br /> Aggregate Industries—Tucson South Amendment—MLRB 112 Permit Application <br /> Exhibit D-4 <br />