C. Project Description. Describe all aspects of the operation including mining, milling, and <br /> exploration methods, materials, equipment, workforce, construction and operation schedule, power <br /> requirements, how clearing will be accomplished, topsoil stockpile, waste rock placement, tailings <br /> disposal, proposed number of drillholes and depth, depth of proposed suction dredging and how <br /> gravels will be replaced, etc. Calculate prodiction rates of ore. Include justification and <br /> calculations for settling pond capacities, and the size of runoff diversion channels. <br /> The Lombard #3 Adit will be opened bu using a Bobcat E-85 Mini Excavator with a 24" bucket. <br /> The excavated dirt will be stockpiled by a Cat 940 front end loader. This location will be within <br /> the permit boundries. <br /> Once the adit is opened, oxygen levels will be measured and extensive testing of vein samples <br /> Will begin. At this time underground mapping will comence, No drilling will be done. <br /> Construction of the adit Qate and lock will also be in. <br /> The samples will come from inside the Adit; Testing will haven off-site. <br /> (If more sPace is needed to fdl out a blocl ofinfo.malron, use additianal sAcen and anacA form) <br /> -3- <br />