Laserfiche WebLink
3. Describe the measures to be taken for release of a reportable quantity of a hazardous <br /> rnattKiai or the release of a toxic substance. This includes plans for spill prevention, <br /> containment. notification and cleanup <br /> None Used <br /> H Reclamation. Describe the annual and final reclamation standards based on the anticipated <br /> schedule for construCtlOnL operations. and project closure Include such items as the removal of <br /> structures and facilities including bridges and culverts, a revegetation plan, permanent containment <br /> of mine tailings, waste, or sludges which pose a threat of a release into the environment closing <br /> ponds and eliminating standing water. a final surface shaping plan, and post operations monitoring <br /> and maintenance plans <br /> So* r*clamatlon Plan in DRMSApptiSa#*p <br /> We will fill the adit with excavated material. See DRMS Reclamation Plan Exhibit D. <br /> Straw waddle can be used to prevent storm or snow runoff of excavation piles <br /> ---------- <br /> Vt. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br /> A Required changes/modificationsispectal mitigation for plan of operations <br /> tlj more tfta-e j,nerded to fklovi a blocA air addinonal them aad"w A 10im, <br />