Laserfiche WebLink
The applicant will rely on a municipal water source, specifically the City of <br /> Idaho Springs, CO. Ms. Wonder Martell of the City of Idaho Springs executed the <br /> account documents on January 26, 2021 and are provided herein. <br /> The GTM is not a mining operation. Groundwater will not be encountered, <br /> intercepted or impacted. The mill will not discharge process water, thus not <br /> impacting the nearby surface water Clear Creek. Storm water will be managed with <br /> road side ditches from mill structures. Stormwater run-off from the interior road will <br /> be conveyed off-site via roadside ditches. <br /> GTM will not impact the hydrologic balance. Precipitation will be managed <br /> via engineered drainage structures, and roadside ditches. Storm water will discharge <br /> at historic rates, preventing off-site damage. <br /> The future land use is industrial/commercial that will manifest as a building <br /> and two loading areas with appropriately engineered drainage system. <br /> Explosives will not be used during milling or reclamation. <br /> Page 7 of 23 <br />