My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-07_REVISION - C1983059 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2021-09-07_REVISION - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 5:57:36 AM
Creation date
9/8/2021 5:48:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Revision
Doc Date
9/7/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT8
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize/Demobilize Equipment for Reclamation <br /> Site: Terror Creek Loadout Permit Action: MT8 Permit/Job#: C1983059 <br /> PROJECT IDENTIFICATION <br /> Task#: 18A State: Colorado Abbreviation: None <br /> Date: 8/30/2021 County: Delta Filename: 05918A <br /> 12:45:42 PM <br /> User: LDS <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT, <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> CatD9T-9SU 60.01 $126.01 $147.95 1 $273.96 $147.95 $250.00 <br /> CAT 815F 22.88 $91.25 $68.37 1 $159.62 $68.37 $250.00 <br /> Cat623G 41.35 $207.90 $132.49 1 $340.39 $132.49 $250.00 <br /> CAT 14M 23.57 $85.80 $68.37 1 $154.17 1 $68.37 1 $250.00 <br /> Subtotals: 1 $928.14 $417.18 $1,000.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Flatbed Truck,6x4,45K GVW $49.15 1 $49.15 $49.15 <br /> Fuel Tanker,4x2, 170 HP $29.70 1 $29.70 $29.70 <br /> Subtotals: $78.85 $78.85 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.