My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-07_REVISION - C1983059 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2021-09-07_REVISION - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 5:57:36 AM
Creation date
9/8/2021 5:48:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Revision
Doc Date
9/7/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT8
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br /> Task description: Demolish and Remove All Structures <br /> Site: Terror Creek Loadout Permit Action: MT8 Permit/Job#: C1983059 <br /> PROJECT IDENTIFICATION <br /> Task#: 15A State: Colorado Abbreviation: None <br /> Date: 8/4/2021 County: Delta Filename: 05915A <br /> User: LDS <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 98.20% <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> Control Tower 16'xl4'x26' Bldg.(MN)demo./on- 5,824.00 CF $0.24 $1,386.11 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Pad 16'xl4'x6" Demo.and on-site 288.00 SF $1.05 $303.26 <br /> disposal in excavated <br /> pit,6 in.thick-Max. <br /> 200 ft.push <br /> Substation 16'x24'x20' Bldg.(MN)demo./on- 7,680.00 CF $0.24 $1,827.84 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Pad 12'x10'x8" Demo.and on-site 120.00 SF $1.40 $168.48 <br /> disposal in excavated <br /> pit,8 in.thick-Max. <br /> 200 ft.push <br /> -Footing 1'x2'x44 LF Demo.and on-site 44.00 LF $4.21 $185.24 <br /> disposal in excavated <br /> pit, 1.0 ft.x 2 ft.-Max. <br /> 200 ft.push <br /> Secondary Substation 9'x4'x6' Bldg.(SN)demo./on- 216.00 CF $0.22 $47.09 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Pad 16'x6'x8" Demo.and on-site 96.00 SF $1.34 $129.02 <br /> disposal in existing pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br /> Storage Building 52'xl2'x8' Bldg.(SN)demo./on- 4,992.00 CF $0.22 $1,088.26 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Pad 52'xl2'x6" Demo.and on-site 624.00 SF $1.05 $657.07 <br /> disposal in excavated <br /> pit,6 in.thick-Max. <br /> 200 ft.push <br /> Scale House 9'x8'x8' Bldg.(SN)demo./on- 576.00 CF $0.22 $125.57 <br /> site disposal in <br /> excavated pit-Max. <br /> 200 ft.push <br /> -Pad 9'x8'x8" Demo.and on-site 72.00 SF $1.34 $96.77 <br /> disposal in existing pit, <br /> 8 in.thick-Max.200 ft. <br /> push <br />
The URL can be used to link to this page
Your browser does not support the video tag.