Laserfiche WebLink
COMPACTION WORK <br /> Task description: Compact Coal Material in On-Site Disposal Area <br /> Site: Terror Creek Loadout Permit Action: MT8 Permit/Job#: C1983059 <br /> PROJECT IDENTIFICATION <br /> Task#: 05A State: Colorado Abbreviation: None <br /> Date: 8/30/2021 County: Delta Filename: 05905A <br /> 12:37:33 PM <br /> User: LDS <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 815F Horsepower: 240 <br /> Compactor Type: Soil-tamping foot Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $91.25 NA <br /> Operating Cost/Hour: $66.66 100 <br /> Operator Cost/Hour: $26.02 NA <br /> Total Unit Cost/Hour: $183.93 <br /> Total Fleet Cost/Hour: $183.93 <br /> MATERIAL QUANTITIES <br /> Loose volume: 9,559 LCY Shrinkage factor: 0.870 <br /> Compacted volume: 8,316 CCY <br /> Source of estimated volume: Map 5 -Assume Y Over 5 Acres <br /> Source of estimated shrinkage factor: Cat Handbook <br /> HOURLY PRODUCTION Unadjusted hourly production=(W x S x L x C)/P <br /> Compacted width per pass(W): 6.50 feet <br /> Average Compactor Speed(S): 5.00 mph <br /> Compacted thickness of each lift(L): 10.00 inches <br /> Conversion Constant(C): 16.3 (5,280ft./12in./27cu.ft.) <br /> Required number of machine passes(P): 5 passes <br /> Unadjusted Hourly Unit Production: 1,059.50 CCY/hour <br /> Job Condition Correction Factors Site Altitude: 5,800 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.8300 multiplier <br /> Adjusted Hourly Unit Production: 879.39 CCY/Hour <br /> Adjusted Hourly Fleet Production: 879.39 CCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Compactor(s) Total job time: 9.46 Hours <br /> Unit cost: $0.209 per CCY Total job cost: $1,739 <br /> CIRCES Cost Estimating Software <br />