Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#03A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Move Sediment Storage Pile for On-Site Disposal <br /> Site: Terror Creek Loadout Permit Action: MT8 Permit/Job#: C1983059 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 8/30/2021 County: Delta Filename: 05903A <br /> 12:36:23 PM <br /> User: LDS <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $126.01 NA <br /> Operating Cost/Hour: $141.41 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $308.72 <br /> Total Fleet Cost/Hour: $308.72 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,500 <br /> Swell factor: 1.125 <br /> Loose volume: 1,688 LCY <br /> Source of estimated volume: Map 5;Page 2.05-3 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 200 feet <br /> Unadjusted hourly production: 700.0 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: 0% <br /> Average site altitude: 5,800 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Earth-Dry packed <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.900 (AB.AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br />