My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-07_GENERAL DOCUMENTS - C1983059
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1983059
>
2021-09-07_GENERAL DOCUMENTS - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 5:57:39 AM
Creation date
9/8/2021 5:33:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
9/7/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Mid-term Review No.8 <br /> Site: Terror Creek Loadout Permit Action: MT8 Permit/Job#: C1983059 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 8/30/2021 County: Delta Filename: C059-000 <br /> 12:48:26 PM <br /> User: LDS <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> OIA Remove Coal Material from Disturbed Area DOZER 1 15.45 $4,771 <br /> 03A Move Sediment Storage Pile for On-Site Disposal DOZER 1 3.98 $1,227 <br /> 05A Compact Coal Material in On-Site Disposal Area COMPACT 1 9.45 $1,739 <br /> 12A Plug and Seal 3 Alluvial Monitoring Wells BOREHOLE 1 8.00 $1,098 <br /> 15A Demolish and Remove All Structures DEMOLISH 1 200.00 $145,332 <br /> 18A Mobilize/Demobilize Equipment for Reclamation MOBILIZE 1 6.00 $6,705 <br /> SUBTOTALS: 242.88 $160,872 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $3,250 <br /> Performance bond: 1.05 Total= $1,689 <br /> Job superintendent: 121.44 Total= $8,747 <br /> Profit: 10.00 Total= $16,087 <br /> TOTAL O&P= $29,773 <br /> CONTRACT AMOUNT(direct+O&P)= $190,645 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 7.22 Total= $13,765 <br /> Reclamation management and/or administration: 5.30 $10,104 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $54,142 <br /> TOTAL BOND AMOUNT(direct+indirect)= $215,014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.