My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-07_REVISION - M1973021 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2021-09-07_REVISION - M1973021 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2021 1:26:24 PM
Creation date
9/7/2021 12:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
9/7/2021
Doc Name Note
Appendix 1 Geotech Exhibit
Doc Name
Adequacy Review Response
From
Aggregate Industries-WCR, Inc.
To
DRMS
Type & Sequence
AM7
Email Name
ECS
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
747
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
north-south. In project documents, the J1 joint set typically strikes east-west and the J2 joint <br /> set typically strikes north-south. Both sets are similar in spacing, roughness, and condition. <br /> The joint sets are closely spaced (SP5: 0.1 to 0.3 ft)to very widely spaced (SP2: 3 to 10 ft). <br /> Joint surfaces are planar and are stepped (R1)to moderately rough (R4). The joint sets are <br /> less continuous than the foliation joints and are mostly discontinuous (C1: less than 3 ft <br /> lengths)to slightly continuous (C2: 3 to 10 ft). Iron staining is observed on many joint <br /> surfaces, with less staining typically observed at lower elevations. Most joints generally do <br /> not contain infill material. <br /> Figure 2-1 shows stereonet projections for discontinuities at the South Quarry and the West <br /> Quarry. <br /> i13 <br /> 13 r <br /> W ;11 I � �E <br /> s #1 <br /> ���-�lofic oiwc <br /> s <br /> 7ttl�Llke � <br /> w � E <br /> 5� <br /> } hdrn'U1srt <br /> S <br /> Figure 2-1. Stereonet plots showing poles to planes with average joint set <br /> windows for the South Quarry (upper) and West Quarry (lower). <br /> 9 <br /> Aggregate Industries—Morrison Quarry GEI Consultants, Inc. <br /> AM-07 Geotechnical Stability Exhibit November 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.