Laserfiche WebLink
Aggregate Industries, Morrison Quarry <br /> Amendment No.7 to Permit M-1973-021 FN <br /> Morrison,CO <br /> Exhibit DA presents the West Quarry Haul Road final configuration. Exhibit D.2 presents the <br /> buildout configuration for Phase III in plan view. A detailed narrative for Phase III is provided <br /> below. <br /> Mining Operation Support Structures <br /> Phase III mining operations prioritize completion of support structures critical to re-establishing <br /> access to the upper quarry and maintaining surface drainage control as mining in the South and <br /> West Quarries progress. <br /> Construction of the West Quarry Haul Road, a structure necessary to re-establish access to the <br /> upper benches of the South Quarry and commence West Quarry development, is underway and <br /> is scheduled for completion in late fall 2021. The Haul Road plans were summarized in <br /> Technical Review (TR07) and approved in July 2020. TR07 included the haul road design <br /> specifications and proposed configuration, but recognized that the final road alignment was <br /> pending and would be finalized in conjunction with AM07. Since the start of the construction, fill <br /> material limitations have resulted in a change to the road alignment to maximize the use of cut <br /> material. Exhibit D.1 presents the final West Quarry Haul Road design configuration, based on <br /> work completed to date and current design plans. As mining and reclamation continues in the <br /> South and West Quarries, the haul road will be removed as benches progress eastward. <br /> Once haul road construction is complete and concurrent with the South and West Quarry upper <br /> bench reclamation activities, runoff from UD#1 will be permanently diverted to UD#2. The <br /> drainage diversion structure consists of an open culvert and two detention basins: one at the <br /> culvert inlet and one at the UD#2 culvert outlet. All drainage diversion structures were sized <br /> based on calculated 100-year peak flow rates and runoff volumes to limit impacts to <br /> downstream structures in UD#2. Both detention basins will include emergency spillways, <br /> designed to accommodate 500-year peak flow with 50% grate blockage. Detention Basin 2, the <br /> inlet basin, will be installed at approximate El. 7,040 on the north side of the South Quarry <br /> western face to intercept UD#1 along its natural flow path. Water will pass through the outlet <br /> control structure to a culvert to be installed on the existing upper western bench at El. 7,040 with <br /> a slope of 0.2% carrying water south along the bench towards UD#2. Once the culvert exits the <br /> western face bench, the slope will increase to 1.1% and pass through a control structure to <br /> enter Detention Basin #2. From there, water will discharge to UD#2. The drainage diversion will <br /> remain after mining activities are complete. The draft final Drainage design can be found in <br /> Appendix 2, and Exhibit F.3 presents its final configuration. <br /> South Quarry Development <br /> Phase III continues full development of the South Quarry. South Quarry mining activities will first <br /> focus on lowering existing benches in the southwestern corner of the quarry to El. 6,500. The <br /> 2020 Annual Report Geotechnical Addendum and visual inspections for benches completed <br /> through April 2021 in this area have identified localized instabilities and slope failures. Based on <br /> these observations, remaining bench configurations in the southwestern corner of the South <br /> Quarry will be a maximum bench height of 40 feet and a minimum bench width of 40 feet, for a <br /> maximum bench configuration of 40H:40V. Once mining in this area is completed, mining will <br /> September 2021 1 17 <br />