Laserfiche WebLink
Aggregate Industries, Morrison Quarry <br /> Amendment No.7 to Permit M-1973-021 FN <br /> Morrison,CO <br /> fir will only be planted in the upper areas of the north-facing slopes of the reclaimed areas after <br /> final mining. For reclamation costs (see Exhibit L— Reclamation Costs), it is assumed 100 <br /> plantings (50 shrubs/50trees) per acre will be planted. <br /> In addition to hydroseeding as well as shrub and tree plantings, the operator proposes the use <br /> of available sources of wood debris and rock to provide nesting habitat along the reclaimed <br /> benches. Woody debris and rock structures are to be placed along benches at approximately <br /> 300-foot intervals as shown in Exhibit F.5. These structures include: <br /> • Free standing snags: Upright trees with root ball anchored below finish grade <br /> • Habitat root wad: Minimum 18-inch diameter tree laid on its side with the root wad partially <br /> buried <br /> • Brush log piles: Miscellaneous stumps and branches placed in 10-foot-diameter piles <br /> • Rock piles: To be placed along lower benches to provide protection for wildlife <br /> Schedule <br /> Reclamation will resume in the upper benches of the South Quarry in 2020-2021, after an <br /> access road leading to the West Quarry is built. The lower benches of the South Quarry will be <br /> reclaimed in an expedient manner as mining resumes. West Quarry reclamation will take place <br /> concurrently with mining, which is scheduled to begin in 2021. Mining and reclamation of the <br /> South and West Quarries is anticipated to end in 2043-2044. <br /> Planned Reclamation Scope of Work <br /> Item 1.0 Mobilization/Demobilization <br /> This item includes all costs necessary and incidental to move equipment and supplies onto the <br /> project area; perform minimal road improvements, if required; move equipment within the <br /> project area during the course of the project; and fulfill any other requirements necessary for the <br /> successful completion of this project. The operator will maintain such temporary works and <br /> equipment throughout the period of construction. This item also includes all labor, equipment, <br /> and costs associated with demobilization and clean-up of the project site following completion of <br /> the project. For the scope of work proposed, Aggregate Industries, Inc. assumes that the <br /> following equipment will be mobilized to the site: <br /> • (1) Front-end wheel loader with a 4.5-cubic-yard bucket (Caterpillar 950 or equivalent) <br /> • (1) Track-mounted excavator (Caterpillar 349 or equivalent) <br /> • (1) Bulldozer (Caterpillar D9 or equivalent) <br /> • (2) Articulating 50-ton haul truck (Caterpillar 740 or equivalent) <br /> This equipment will most likely be provided by the operator; however, the equipment can also <br /> be rented from Wagner Rents— Caterpillar Rental, 17800 E 22nd Avenue, Aurora, Colorado <br /> 80011. <br /> September 2021 1 32 <br />