Laserfiche WebLink
Culvert #59 <br />18" <br />Pipe, corrugated metal <br />28.00 <br />LF <br />$5.57 <br />$156.07 <br />(CMP) - 18 in. <br />diameter pipe <br />Culvert #60 <br />24" <br />Pipe, corrugated metal <br />31.00 <br />LF <br />$7.25 <br />$224.87 <br />(CMP) - 24 in. <br />diameter pipe <br />Culvert #61 <br />8" <br />Pipe, corrugated metal <br />25.00 <br />LF <br />$3.12 <br />$78.08 <br />(CMP) - 8 in. diameter <br />pipe <br />Culvert #62 <br />12" <br />Pipe, corrugated metal <br />13.00 <br />LF <br />$4.10 <br />$53.26 <br />(CMP) - 12 in. <br />diameter pipe <br />Culvert #64 <br />24" <br />Pipe, corrugated metal <br />50.00 <br />LF <br />$7.25 <br />$362.70 <br />(CMP) - 24 in. <br />diameter pipe <br />Culvert #65 <br />12" <br />Pipe, corrugated metal <br />19.00 <br />LF <br />$4.10 <br />$77.84 <br />(CMP) - 12 in. <br />diameter pipe <br />Culvert #66 <br />18" <br />Pipe, corrugated metal <br />18.00 <br />LF <br />$5.57 <br />$100.33 <br />(CMP) - 18 in. <br />diameter pipe <br />Culvert #67 <br />18" <br />Pipe, corrugated metal <br />22.00 <br />LF <br />$5.57 <br />$122.63 <br />(CMP) - 18 in. <br />diameter pipe <br />Culvert #68 <br />18" <br />Pipe, corrugated metal <br />48.00 <br />LF <br />$5.57 <br />$267.55 <br />(CMP) - 18 in. <br />diameter pipe <br />Culvert #69 <br />18" <br />Pipe, corrugated metal <br />80.00 <br />LF <br />$5.57 <br />$445.92 <br />(CMP) - 18 in. <br />diameter pipe <br />Bates Portal <br />8'X970 LF <br />Conveyor, Horizontal <br />15.80 <br />EA <br />$3,125.00 <br />$49,375.00 <br />Conveyor to Breaker <br />Belt 24" Belt, 61.5' <br />Bldg. <br />Length <br />Jansen Loadout <br />15'X40' <br />Demo. and on -site <br />600.00 <br />SF <br />$2.00 <br />$1,201.20 <br />Truck Scale <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />Jansen Coal <br />2,740 LF <br />Conveyor, Horizontal <br />44.50 <br />EA <br />$3,125.00 <br />$139,062.50 <br />Conveyor <br />Belt 24" Belt, 61.5' <br />Length <br />-Footers <br />45cy <br />Pavement, concrete, <br />45.00 <br />CY <br />$133.50 <br />$6,007.50 <br />demolition only, 7 in. <br />to 24 in. thick - <br />Reinforced <br />-Transfer Points <br />10'X10'X10' (3) <br />Bldg. (MN) demo./on- <br />3,000.00 <br />CF <br />$0.22 <br />$657.00 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Footers <br />3'X2' <br />Demo. and on -site <br />120.00 <br />LF <br />$12.01 <br />$1,441.20 <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />Jansen Loadout Bin <br />38'X35'X40' <br />Bldg. (MN) demo./on- <br />53,200.00 <br />CF <br />$0.22 <br />$11,650.80 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Jansen Feed Hopper <br />20'X15'X16' <br />Bldg. (MN) demo./on- <br />4,920.00 <br />CF <br />$0.22 <br />$1,077.48 <br />site disposal in existing <br />